Marketing: count the whole spend, hold every channel to a ceiling, and know what marketing really brings in
Text lesson
Count the whole marketing spend, hold every channel to a ceiling, and see what marketing brings in.
The Profitable Growth Operating System
Marketing is which offer people ask for. Follow the offer that already sells.
Opening this screen.
Jan 15–Dec 15, 2025 · campaigns over budget
13 ?
A campaign is over budget when spend is past the budget named on this book. This count is not a dollar.
This opens that screen. Nothing is saved, and nothing is sent.
Your material margin divided by the full cost of your people. Material margin is sales less what you paid others for what you sold: materials, freight and rebates.
2.5 or higher, and rising. 2.5 to 3.5 is the healthy middle; 4.0 is exceptional. Calibrate for your industry.
What to do: Below 2.5, fix price, mix and complexity before you add sales capacity. Watch the direction more than the level.
From your P&L
Watch the 60-second lesson: Whether growth will pay.
Jan 15–Dec 15, 2025 · what each channel costs, and the profit it holds ?
This page is the channels, the cost of a lead, and the profit those channels hold. Spend is not the pipeline dollar. Nothing posts until you approve a sourced pipeline. Nothing is sent.
Larkspur Precision
Done when you can read Core spend, profit created, pipeline versus spend, the Profit Bridge line, and the next review date, and open the screen that needs work.
No channel file is loaded yet. Upload a file with a channel, a spend, and the pipeline the channel sourced.
Upload the channel file. It needs a channel name. A blank pipeline cell stays blank. It is not stored as zero.
The marketing file is loading. Channel numbers appear when the file is ready.
Spend follows profit. The few segments, products and customers who hold 80% of it are Core, and campaigns are aimed there. Pipeline is a leading measure. A win is a named, attributed dollar with an assumption and an approval, and only an approved, attributed win that is not already on Sales reaches the Profit Bridge. Copy is drafted, never sent. ActiveCampaign can hold a draft. Nothing is sent.
Marketing owner Nina Pell.
5 of 10 channels are 85% of known spend.
Channels to look at ?
Each card is one channel. The dollar is spend with no leads, or the extra spend above the cost per lead on this file. Accept notes the channel. It does not post a dollar.
These are what we believe based on the data you gave us. Verify each line. You decide.
| What to look at | Suggested action | Dollar | Why | Source rows | Decide |
|---|---|---|---|---|---|
| Dune Line 1 | Keep Dune Line 1 | $622,080.00 | The dollar is the profit already on Dune Line 1. | Dune Line 1 | |
| Ellis Supply 2 | Keep Ellis Supply 2 | $622,080.00 | The dollar is the profit already on Ellis Supply 2. | Ellis Supply 2 | |
| Core renewals | Keep Core renewals | $528,768.00 | The dollar is the profit already on Core renewals. | Core renewals | |
| Standard skids | Keep Standard skids | $342,144.00 | The dollar is the profit already on Standard skids. | Standard skids | |
| Stocked parts | Keep Stocked parts | $248,832.00 | The dollar is the profit already on Stocked parts. | Stocked parts | |
| Standard line 1 | Keep Standard line 1 | $241,920.00 | The dollar is the profit already on Standard line 1. | Standard line 1 | |
| Standard line 2 | Keep Standard line 2 | $241,920.00 | The dollar is the profit already on Standard line 2. | Standard line 2 | |
| Contract service | Keep Contract service | $186,624.00 | The dollar is the profit already on Contract service. | Contract service |
| What to look at | Suggested action | Dollar | Why | Source rows | Decide |
|---|---|---|---|---|---|
| Trade shows | Keep Trade shows | $146,999.99 | The dollar is the spend already on Trade shows. | Trade shows | |
| Spec builds | Keep Spec builds | $124,416.00 | The dollar is the profit already on Spec builds. | Spec builds | |
| Application content | Keep Application content | $105,000.00 | The dollar is the spend already on Application content. | Application content | |
| Fenn Route 3 | Keep Fenn Route 3 | $77,760.00 | The dollar is the profit already on Fenn Route 3. | Fenn Route 3 | |
| Grove Field 4 | Keep Grove Field 4 | $77,760.00 | The dollar is the profit already on Grove Field 4. | Grove Field 4 | |
| Hart Foundry 5 | Keep Hart Foundry 5 | $77,760.00 | The dollar is the profit already on Hart Foundry 5. | Hart Foundry 5 | |
| Replacement cycles | Keep Replacement cycles | $77,760.00 | The dollar is the profit already on Replacement cycles. | Replacement cycles | |
| Regional stock | Keep Regional stock | $31,104.00 | The dollar is the profit already on Regional stock. | Regional stock | |
| Late catalog flight 9 | Keep Late catalog flight 9 inside the budget on the file | $23,760.00 | The dollar is the spend already on Late catalog flight 9. | Late catalog flight 9 | |
| Standard line 3 | Keep Standard line 3 | $22,680.00 | The dollar is the profit already on Standard line 3. | Standard line 3 | |
| Standard line 4 | Keep Standard line 4 | $22,680.00 | The dollar is the profit already on Standard line 4. | Standard line 4 | |
| Standard line 5 | Keep Standard line 5 | $22,680.00 | The dollar is the profit already on Standard line 5. | Standard line 5 | |
| Standard line 6 | Keep Standard line 6 | $22,680.00 | The dollar is the profit already on Standard line 6. | Standard line 6 | |
| Distributor partners flight 44 | Keep Distributor partners flight 44 inside the budget on the file | $21,870.00 | The dollar is the spend already on Distributor partners flight 44. | Distributor partners flight 44 | |
| Custom one-off ads flight 18 | Keep Custom one-off ads flight 18 inside the budget on the file | $21,120.00 | The dollar is the spend already on Custom one-off ads flight 18. | Custom one-off ads flight 18 | |
| Custom one-off ads flight 8 | Keep Custom one-off ads flight 8 inside the budget on the file | $20,250.00 | The dollar is the budget already on Custom one-off ads flight 8. | Custom one-off ads flight 8 | |
| Alden Yard 18 | Stop spend aimed at Alden Yard 18 | $19,995.43 | Alden Yard 18 loses money. The dollar is that loss on this row. | Alden Yard 18 | |
| Reed Foundry 15 | Stop spend aimed at Reed Foundry 15 | $19,995.43 | Reed Foundry 15 loses money. The dollar is that loss on this row. | Reed Foundry 15 | |
| Distributor partners flight 34 | Keep Distributor partners flight 34 inside the budget on the file | $19,980.00 | The dollar is the spend already on Distributor partners flight 34. | Distributor partners flight 34 | |
| Paid search flight 27 | Keep Paid search flight 27 inside the budget on the file | $18,480.00 | The dollar is the spend already on Paid search flight 27. | Paid search flight 27 | |
| Distributor partners flight 24 | Keep Distributor partners flight 24 inside the budget on the file | $18,090.00 | The dollar is the spend already on Distributor partners flight 24. | Distributor partners flight 24 | |
| Quill Field 14 | Stop spend aimed at Quill Field 14 | $17,773.71 | Quill Field 14 loses money. The dollar is that loss on this row. | Quill Field 14 | |
| Tarn Works 17 | Stop spend aimed at Tarn Works 17 | $17,773.71 | Tarn Works 17 loses money. The dollar is that loss on this row. | Tarn Works 17 | |
| Specification library flight 43 | Keep Specification library flight 43 inside the budget on the file | $17,760.00 | The dollar is the spend already on Specification library flight 43. | Specification library flight 43 | |
| Paid search flight 17 | Keep Paid search flight 17 inside the budget on the file | $17,010.00 | The dollar is the spend already on Paid search flight 17. | Paid search flight 17 | |
| Distributor partners flight 14 | Keep Distributor partners flight 14 inside the budget on the file | $16,200.00 | The dollar is the spend already on Distributor partners flight 14. | Distributor partners flight 14 | |
| Specification library flight 33 | Keep Specification library flight 33 inside the budget on the file | $16,080.00 | The dollar is the spend already on Specification library flight 33. | Specification library flight 33 | |
| Print flight 36 | Keep Print flight 36 inside the budget on the file | $15,840.00 | The dollar is the spend already on Print flight 36. | Print flight 36 | |
| One-off calls | Keep One-off calls | $15,552.00 | The dollar is the profit already on One-off calls. | One-off calls | |
| Pike Route 13 | Stop spend aimed at Pike Route 13 | $15,552.00 | Pike Route 13 loses money. The dollar is that loss on this row. | Pike Route 13 | |
| Sable Shop 16 | Stop spend aimed at Sable Shop 16 | $15,552.00 | Sable Shop 16 loses money. The dollar is that loss on this row. | Sable Shop 16 | |
| Application content flight 52 | Keep Application content flight 52 inside the budget on the file | $15,540.00 | The dollar is the spend already on Application content flight 52. | Application content flight 52 | |
| Print flight 26 | Keep Print flight 26 inside the budget on the file | $14,580.00 | The dollar is the spend already on Print flight 26. | Print flight 26 | |
| Late catalog flight 49 | Keep Late catalog flight 49 inside the budget on the file | $14,310.00 | The dollar is the spend already on Late catalog flight 49. | Late catalog flight 49 | |
| Application content flight 42 | Keep Application content flight 42 inside the budget on the file | $14,070.00 | The dollar is the spend already on Application content flight 42. | Application content flight 42 | |
| Print flight 16 | Keep Print flight 16 inside the budget on the file | $13,320.00 | The dollar is the spend already on Print flight 16. | Print flight 16 | |
| Specification library flight 13 | Keep Specification library flight 13 inside the budget on the file | $12,720.00 | The dollar is the spend already on Specification library flight 13. | Specification library flight 13 | |
| Application content flight 32 | Keep Application content flight 32 inside the budget on the file | $12,600.00 | The dollar is the spend already on Application content flight 32. | Application content flight 32 | |
| Late catalog flight 39 | Keep Late catalog flight 39 inside the budget on the file | $12,420.00 | The dollar is the spend already on Late catalog flight 39. | Late catalog flight 39 | |
| Trade shows flight 51 | Keep Trade shows flight 51 inside the budget on the file | $12,060.00 | The dollar is the spend already on Trade shows flight 51. | Trade shows flight 51 | |
| Ives Shop 6 | Keep Ives Shop 6 | $11,108.57 | The dollar is the profit already on Ives Shop 6. | Ives Shop 6 | |
| Jory Works 7 | Keep Jory Works 7 | $11,108.57 | The dollar is the profit already on Jory Works 7. | Jory Works 7 | |
| Keel Yard 8 | Keep Keel Yard 8 | $11,108.57 | The dollar is the profit already on Keel Yard 8. | Keel Yard 8 | |
| Lark Plant 9 | Keep Lark Plant 9 | $11,108.57 | The dollar is the profit already on Lark Plant 9. | Lark Plant 9 | |
| Moss Mill 10 | Keep Moss Mill 10 | $11,108.57 | The dollar is the profit already on Moss Mill 10. | Moss Mill 10 | |
| Nash Line 11 | Keep Nash Line 11 | $11,108.57 | The dollar is the profit already on Nash Line 11. | Nash Line 11 | |
| Oran Supply 12 | Keep Oran Supply 12 | $11,108.57 | The dollar is the profit already on Oran Supply 12. | Oran Supply 12 | |
| Custom one-off ads flight 48 | Keep Custom one-off ads flight 48 inside the budget on the file | $11,040.00 | The dollar is the spend already on Custom one-off ads flight 48. | Custom one-off ads flight 48 | |
| Trade shows flight 41 | Keep Trade shows flight 41 inside the budget on the file | $10,800.00 | The dollar is the spend already on Trade shows flight 41. | Trade shows flight 41 | |
| Late catalog flight 29 | Keep Late catalog flight 29 inside the budget on the file | $10,530.00 | The dollar is the spend already on Late catalog flight 29. | Late catalog flight 29 | |
| Paid search flight 7 | Keep Paid search flight 7 inside the budget on the file | $10,175.00 | The dollar is the spend already on Paid search flight 7. | Paid search flight 7 | |
| Application content flight 12 | Keep Application content flight 12 inside the budget on the file | $9,660.00 | The dollar is the spend already on Application content flight 12. | Application content flight 12 | |
| Trade shows flight 31 | Keep Trade shows flight 31 inside the budget on the file | $9,540.00 | The dollar is the spend already on Trade shows flight 31. | Trade shows flight 31 | |
| Custom one-off ads flight 38 | Keep Custom one-off ads flight 38 inside the budget on the file | $9,360.00 | The dollar is the spend already on Custom one-off ads flight 38. | Custom one-off ads flight 38 | |
| Print flight 6 | Keep Print flight 6 inside the budget on the file | $9,212.50 | The dollar is the spend already on Print flight 6. | Print flight 6 | |
| Late catalog flight 19 | Keep Late catalog flight 19 inside the budget on the file | $8,640.00 | The dollar is the spend already on Late catalog flight 19. | Late catalog flight 19 | |
| Trade shows flight 21 | Keep Trade shows flight 21 inside the budget on the file | $8,280.00 | The dollar is the spend already on Trade shows flight 21. | Trade shows flight 21 | |
| Engineer email flight 5 | Keep Engineer email flight 5 inside the budget on the file | $8,250.00 | The dollar is the spend already on Engineer email flight 5. | Engineer email flight 5 | |
| Paid search flight 47 | Keep Paid search flight 47 inside the budget on the file | $8,190.00 | The dollar is the spend already on Paid search flight 47. | Paid search flight 47 | |
| Custom one-off ads flight 28 | Keep Custom one-off ads flight 28 inside the budget on the file | $7,680.00 | The dollar is the spend already on Custom one-off ads flight 28. | Custom one-off ads flight 28 | |
| Trade shows flight 11 | Keep Trade shows flight 11 inside the budget on the file | $7,020.00 | The dollar is the spend already on Trade shows flight 11. | Trade shows flight 11 | |
| Paid search | Shift spend off Paid search | $6,936.54 | Paid search costs more per lead than the channels on this file. The dollar is that extra spend. | Paid search | |
| Distributor partners | Shift spend off Distributor partners | $6,762.21 | Distributor partners costs more per lead than the channels on this file. The dollar is that extra spend. | Distributor partners | |
| Paid search flight 37 | Keep Paid search flight 37 inside the budget on the file | $6,720.00 | The dollar is the spend already on Paid search flight 37. | Paid search flight 37 | |
| Shift spend off Print | $6,477.77 | Print costs more per lead than the channels on this file. The dollar is that extra spend. | |||
| Engineer email | Shift spend off Engineer email | $6,090.11 | Engineer email costs more per lead than the channels on this file. The dollar is that extra spend. | Engineer email | |
| Print flight 46 | Keep Print flight 46 inside the budget on the file | $5,760.00 | The dollar is the spend already on Print flight 46. | Print flight 46 | |
| Custom one-off ads | Shift spend off Custom one-off ads | $5,718.51 | Custom one-off ads costs more per lead than the channels on this file. The dollar is that extra spend. | Custom one-off ads | |
| Specification library | Shift spend off Specification library | $4,982.20 | Specification library costs more per lead than the channels on this file. The dollar is that extra spend. | Specification library | |
| Tests | Shift spend off Tests | $4,959.27 | Tests costs more per lead than the channels on this file. The dollar is that extra spend. | Tests | |
| Standard line 18 | Stop spend aimed at Standard line 18 | $4,838.40 | Standard line 18 loses money. The dollar is that loss on this row. | Standard line 18 | |
| Late catalog | Shift spend off Late catalog | $4,500.49 | Late catalog costs more per lead than the channels on this file. The dollar is that extra spend. | Late catalog | |
| Engineer email flight 45 | Bring Engineer email flight 45 back to the budget on the file | $4,400.00 | Engineer email flight 45 is past its budget. The dollar is spend minus that budget. | Engineer email flight 45 | |
| Standard line 17 | Stop spend aimed at Standard line 17 | $4,233.60 | Standard line 17 loses money. The dollar is that loss on this row. | Standard line 17 | |
| Engineer email flight 35 | Bring Engineer email flight 35 back to the budget on the file | $4,050.00 | Engineer email flight 35 is past its budget. The dollar is spend minus that budget. | Engineer email flight 35 | |
| Engineer email flight 25 | Bring Engineer email flight 25 back to the budget on the file | $3,700.00 | Engineer email flight 25 is past its budget. The dollar is spend minus that budget. | Engineer email flight 25 | |
| Engineer email flight 15 | Bring Engineer email flight 15 back to the budget on the file | $3,350.00 | Engineer email flight 15 is past its budget. The dollar is spend minus that budget. | Engineer email flight 15 | |
| Distributor partners flight 4 | Bring Distributor partners flight 4 back to the budget on the file | $3,180.00 | Distributor partners flight 4 is past its budget. The dollar is spend minus that budget. | Distributor partners flight 4 | |
| Standard line 10 | Keep Standard line 10 | $3,024.00 | The dollar is the profit already on Standard line 10. | Standard line 10 | |
| Standard line 11 | Keep Standard line 11 | $3,024.00 | The dollar is the profit already on Standard line 11. | Standard line 11 | |
| Standard line 12 | Keep Standard line 12 | $3,024.00 | The dollar is the profit already on Standard line 12. | Standard line 12 | |
| Standard line 13 | Keep Standard line 13 | $3,024.00 | The dollar is the profit already on Standard line 13. | Standard line 13 | |
| Standard line 14 | Keep Standard line 14 | $3,024.00 | The dollar is the profit already on Standard line 14. | Standard line 14 | |
| Standard line 15 | Keep Standard line 15 | $3,024.00 | The dollar is the profit already on Standard line 15. | Standard line 15 | |
| Standard line 16 | Keep Standard line 16 | $3,024.00 | The dollar is the profit already on Standard line 16. | Standard line 16 | |
| Standard line 7 | Keep Standard line 7 | $3,024.00 | The dollar is the profit already on Standard line 7. | Standard line 7 | |
| Standard line 8 | Keep Standard line 8 | $3,024.00 | The dollar is the profit already on Standard line 8. | Standard line 8 | |
| Standard line 9 | Keep Standard line 9 | $3,024.00 | The dollar is the profit already on Standard line 9. | Standard line 9 | |
| Tests flight 50 | Bring Tests flight 50 back to the budget on the file | $3,000.00 | Tests flight 50 is past its budget. The dollar is spend minus that budget. | Tests flight 50 | |
| Specification library flight 3 | Bring Specification library flight 3 back to the budget on the file | $2,760.00 | Specification library flight 3 is past its budget. The dollar is spend minus that budget. | Specification library flight 3 | |
| Tests flight 40 | Bring Tests flight 40 back to the budget on the file | $2,650.00 | Tests flight 40 is past its budget. The dollar is spend minus that budget. | Tests flight 40 | |
| Application content flight 2 | Bring Application content flight 2 back to the budget on the file | $2,340.00 | Application content flight 2 is past its budget. The dollar is spend minus that budget. | Application content flight 2 | |
| Tests flight 30 | Bring Tests flight 30 back to the budget on the file | $2,300.00 | Tests flight 30 is past its budget. The dollar is spend minus that budget. | Tests flight 30 | |
| Tests flight 20 | Bring Tests flight 20 back to the budget on the file | $1,950.00 | Tests flight 20 is past its budget. The dollar is spend minus that budget. | Tests flight 20 | |
| Trade shows flight 1 | Bring Trade shows flight 1 back to the budget on the file | $1,920.00 | Trade shows flight 1 is past its budget. The dollar is spend minus that budget. | Trade shows flight 1 | |
| Tests flight 10 | Bring Tests flight 10 back to the budget on the file | $1,600.00 | Tests flight 10 is past its budget. The dollar is spend minus that budget. | Tests flight 10 |
? Each bar is one channel. The length is that channel's cost per lead beside the highest cost on this book. The dollar is spend divided by known leads. A blank lead count stays off the chart. A channel with no spend and a known lead count shows as zero. Nothing on this chart posts.
? Sourced is the pipeline dollar stored on the channel. Attributed is approved profit tied to that same channel. When a sourced dollar is on the file and no win is approved, attributed shows as zero. A blank sourced dollar stays off the chart. Nothing on this chart posts.
1 more channel holds profit. It stays on the file.
? Each bar is one channel. The length is that channel's approved attributed profit beside the largest on this chart. A blank dollar stays off. A channel marked unknown stays off. The chart shows the eight largest. The rest stay on the file. The dollar does not post.
5 of 14 slices hold the Core profit. 77% of marketing spend is on Core, 2% on the tail.
Jan 15–Dec 15, 2025 · planned pipeline, actual, and variance
Not started Planned $117.2K ?. Actual Not recorded ?. Variance Not recorded ?.
Marketing. Planned $117.2K. Actual Not recorded. Variance Not recorded. Sourced pipeline $24.2M. Profit created $1.2M. Channel ROI 2.81. Spend is not the Profit Bridge number. Jan 15–Dec 15, 2025. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.
Plan is approved pipeline the channel sourced. Spend is not that dollar. Sales forecast dollars are not added. A blank cell stays unknown.
Put the spend on the slices that hold the profit. Core gets the campaigns. The tail, and any work that loses money, does not. A campaign aimed at the tail needs a written exception before it can go live.
Channel ROI is profit created divided by spend. It is a reading. It is not a Profit Bridge dollar. Cost per lead is a reading too. A thin history says there are not enough wins yet.
Pipeline is a leading measure. A pipeline dollar never changes the Profit Bridge. Approved Profit Bridge impact is a sourced dollar, and it posts only after a person approves it. A dollar already on Sales is kept for the ROI reading and is not added again.
Pipeline. $24.2M. Pipeline is not on the Profit Bridge.
Approved Profit Bridge impact. $117.2K. Approved Profit Bridge impact posts only after a person approves it. On the Profit Bridge: $117.2K from 3 approved attributed wins.
Next review 2026-11-16. Channel ROI 2.81 ?.
This book · the counts on the file · not a week or a month ?
In motion is a count on this book: channels with spend, and leads still unknown. After the file is the approved sourced pipeline and the later recorded pipeline. Spend is not that dollar. Nothing here posts until you approve.
Draft only. Nothing is sent.
? 2026-10. No channel names a cost-per-lead ceiling. The cost-per-lead lines use the months already on the file. A channel test stays a draft. Nothing is emailed.
Text lesson
Count the whole marketing spend, hold every channel to a ceiling, and see what marketing brings in.
Book chapter
Count all the money, not one campaign at a time.
This opens that training for this screen. Nothing is saved, and nothing is emailed.
Book chapter
Choose where to show up, and hold each channel to a ceiling.
This opens that training for this screen. Nothing is saved, and nothing is emailed.
Book chapter
Test the channel you like before you fund more of it.
This opens that training for this screen. Nothing is saved, and nothing is emailed.
Book chapter
Find the customers who hold the profit.
This opens that training for this screen. Nothing is saved, and nothing is emailed.
Book chapter
A monthly marketing rhythm.
This opens that training for this screen. Nothing is saved, and nothing is emailed.
Text lesson
Look back at how each channel performed over the year.
This opens that training for this screen. Nothing is saved, and nothing is emailed.
Written lesson
Add every dollar that asks for a lead: people, events, ads, and the agency. One campaign line is not the spend.
Written lesson
Run the channel you like on a small dollar and a date. Read the result. Then decide.
Written lesson
Sourced means marketing opened the door. Attributed means the deal closed and someone can point at the campaign. Do not mix the two dollars.
Download this page as PDF, Word, or PowerPoint. You print it yourself. PGOS does not mail it.
Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.
Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.
Help · What's new · Accessibility · Language
This page shows where demand comes from, and which of it earns.
1 of 3
Speak, then edit the words before you save.
This uses the microphone in your browser. We ask only when you press Speak. The audio is not uploaded and not stored. Only the text you keep is saved with the form.
Confirm?
Shortcut: Alt+M while you are in a field. Press-to-talk stops when you release M.