Help
How to use PGOS
Download

Latest year in this book.

Marketing Book
You
Theme
Light or dark
Language Sign in
Sample: Prairie Supply Co.

Sample company: Prairie Supply Co. These aren't your numbers. See an example: Manufacturer

Other examples

Distributor HVAC and plumbing Coaching

Marketing is which offer people ask for. Follow the offer that already sells.

Jan 15–Dec 15, 2025 · campaigns over budget

13 ?

A campaign is over budget when spend is past the budget named on this book. This count is not a dollar.

Open the campaigns ?

This opens that screen. Nothing is saved, and nothing is sent.

Marketing

Your material margin divided by the full cost of your people. Material margin is sales less what you paid others for what you sold: materials, freight and rebates.

2.5 or higher, and rising. 2.5 to 3.5 is the healthy middle; 4.0 is exceptional. Calibrate for your industry.

What to do: Below 2.5, fix price, mix and complexity before you add sales capacity. Watch the direction more than the level.

From your P&L

Watch the 60-second lesson: Whether growth will pay.

Talk to a person

Jan 15–Dec 15, 2025 · what each channel costs, and the profit it holds ?

This page is the channels, the cost of a lead, and the profit those channels hold. Spend is not the pipeline dollar. Nothing posts until you approve a sourced pipeline. Nothing is sent.

Larkspur Precision

Done when you can read Core spend, profit created, pipeline versus spend, the Profit Bridge line, and the next review date, and open the screen that needs work.

Spend follows profit. The few segments, products and customers who hold 80% of it are Core, and campaigns are aimed there. Pipeline is a leading measure. A win is a named, attributed dollar with an assumption and an approval, and only an approved, attributed win that is not already on Sales reaches the Profit Bridge. Copy is drafted, never sent. ActiveCampaign can hold a draft. Nothing is sent.

Marketing owner Nina Pell.

5 of 10 channels are 85% of known spend.

Channels to look at ?

Each card is one channel. The dollar is spend with no leads, or the extra spend above the cost per lead on this file. Accept notes the channel. It does not post a dollar.

These are what we believe based on the data you gave us. Verify each line. You decide.

Suggestions. Nothing here is posted until you accept a line.
What to look at Suggested action Dollar Why Source rows Decide
Dune Line 1 Keep Dune Line 1 $622,080.00 The dollar is the profit already on Dune Line 1. Dune Line 1
Ellis Supply 2 Keep Ellis Supply 2 $622,080.00 The dollar is the profit already on Ellis Supply 2. Ellis Supply 2
Core renewals Keep Core renewals $528,768.00 The dollar is the profit already on Core renewals. Core renewals
Standard skids Keep Standard skids $342,144.00 The dollar is the profit already on Standard skids. Standard skids
Stocked parts Keep Stocked parts $248,832.00 The dollar is the profit already on Stocked parts. Stocked parts
Standard line 1 Keep Standard line 1 $241,920.00 The dollar is the profit already on Standard line 1. Standard line 1
Standard line 2 Keep Standard line 2 $241,920.00 The dollar is the profit already on Standard line 2. Standard line 2
Contract service Keep Contract service $186,624.00 The dollar is the profit already on Contract service. Contract service
Show the rest (96)
The rest of the suggestions. Nothing here is posted until you accept a line.
What to look at Suggested action Dollar Why Source rows Decide
Trade shows Keep Trade shows $146,999.99 The dollar is the spend already on Trade shows. Trade shows
Spec builds Keep Spec builds $124,416.00 The dollar is the profit already on Spec builds. Spec builds
Application content Keep Application content $105,000.00 The dollar is the spend already on Application content. Application content
Fenn Route 3 Keep Fenn Route 3 $77,760.00 The dollar is the profit already on Fenn Route 3. Fenn Route 3
Grove Field 4 Keep Grove Field 4 $77,760.00 The dollar is the profit already on Grove Field 4. Grove Field 4
Hart Foundry 5 Keep Hart Foundry 5 $77,760.00 The dollar is the profit already on Hart Foundry 5. Hart Foundry 5
Replacement cycles Keep Replacement cycles $77,760.00 The dollar is the profit already on Replacement cycles. Replacement cycles
Regional stock Keep Regional stock $31,104.00 The dollar is the profit already on Regional stock. Regional stock
Late catalog flight 9 Keep Late catalog flight 9 inside the budget on the file $23,760.00 The dollar is the spend already on Late catalog flight 9. Late catalog flight 9
Standard line 3 Keep Standard line 3 $22,680.00 The dollar is the profit already on Standard line 3. Standard line 3
Standard line 4 Keep Standard line 4 $22,680.00 The dollar is the profit already on Standard line 4. Standard line 4
Standard line 5 Keep Standard line 5 $22,680.00 The dollar is the profit already on Standard line 5. Standard line 5
Standard line 6 Keep Standard line 6 $22,680.00 The dollar is the profit already on Standard line 6. Standard line 6
Distributor partners flight 44 Keep Distributor partners flight 44 inside the budget on the file $21,870.00 The dollar is the spend already on Distributor partners flight 44. Distributor partners flight 44
Custom one-off ads flight 18 Keep Custom one-off ads flight 18 inside the budget on the file $21,120.00 The dollar is the spend already on Custom one-off ads flight 18. Custom one-off ads flight 18
Custom one-off ads flight 8 Keep Custom one-off ads flight 8 inside the budget on the file $20,250.00 The dollar is the budget already on Custom one-off ads flight 8. Custom one-off ads flight 8
Alden Yard 18 Stop spend aimed at Alden Yard 18 $19,995.43 Alden Yard 18 loses money. The dollar is that loss on this row. Alden Yard 18
Reed Foundry 15 Stop spend aimed at Reed Foundry 15 $19,995.43 Reed Foundry 15 loses money. The dollar is that loss on this row. Reed Foundry 15
Distributor partners flight 34 Keep Distributor partners flight 34 inside the budget on the file $19,980.00 The dollar is the spend already on Distributor partners flight 34. Distributor partners flight 34
Paid search flight 27 Keep Paid search flight 27 inside the budget on the file $18,480.00 The dollar is the spend already on Paid search flight 27. Paid search flight 27
Distributor partners flight 24 Keep Distributor partners flight 24 inside the budget on the file $18,090.00 The dollar is the spend already on Distributor partners flight 24. Distributor partners flight 24
Quill Field 14 Stop spend aimed at Quill Field 14 $17,773.71 Quill Field 14 loses money. The dollar is that loss on this row. Quill Field 14
Tarn Works 17 Stop spend aimed at Tarn Works 17 $17,773.71 Tarn Works 17 loses money. The dollar is that loss on this row. Tarn Works 17
Specification library flight 43 Keep Specification library flight 43 inside the budget on the file $17,760.00 The dollar is the spend already on Specification library flight 43. Specification library flight 43
Paid search flight 17 Keep Paid search flight 17 inside the budget on the file $17,010.00 The dollar is the spend already on Paid search flight 17. Paid search flight 17
Distributor partners flight 14 Keep Distributor partners flight 14 inside the budget on the file $16,200.00 The dollar is the spend already on Distributor partners flight 14. Distributor partners flight 14
Specification library flight 33 Keep Specification library flight 33 inside the budget on the file $16,080.00 The dollar is the spend already on Specification library flight 33. Specification library flight 33
Print flight 36 Keep Print flight 36 inside the budget on the file $15,840.00 The dollar is the spend already on Print flight 36. Print flight 36
One-off calls Keep One-off calls $15,552.00 The dollar is the profit already on One-off calls. One-off calls
Pike Route 13 Stop spend aimed at Pike Route 13 $15,552.00 Pike Route 13 loses money. The dollar is that loss on this row. Pike Route 13
Sable Shop 16 Stop spend aimed at Sable Shop 16 $15,552.00 Sable Shop 16 loses money. The dollar is that loss on this row. Sable Shop 16
Application content flight 52 Keep Application content flight 52 inside the budget on the file $15,540.00 The dollar is the spend already on Application content flight 52. Application content flight 52
Print flight 26 Keep Print flight 26 inside the budget on the file $14,580.00 The dollar is the spend already on Print flight 26. Print flight 26
Late catalog flight 49 Keep Late catalog flight 49 inside the budget on the file $14,310.00 The dollar is the spend already on Late catalog flight 49. Late catalog flight 49
Application content flight 42 Keep Application content flight 42 inside the budget on the file $14,070.00 The dollar is the spend already on Application content flight 42. Application content flight 42
Print flight 16 Keep Print flight 16 inside the budget on the file $13,320.00 The dollar is the spend already on Print flight 16. Print flight 16
Specification library flight 13 Keep Specification library flight 13 inside the budget on the file $12,720.00 The dollar is the spend already on Specification library flight 13. Specification library flight 13
Application content flight 32 Keep Application content flight 32 inside the budget on the file $12,600.00 The dollar is the spend already on Application content flight 32. Application content flight 32
Late catalog flight 39 Keep Late catalog flight 39 inside the budget on the file $12,420.00 The dollar is the spend already on Late catalog flight 39. Late catalog flight 39
Trade shows flight 51 Keep Trade shows flight 51 inside the budget on the file $12,060.00 The dollar is the spend already on Trade shows flight 51. Trade shows flight 51
Ives Shop 6 Keep Ives Shop 6 $11,108.57 The dollar is the profit already on Ives Shop 6. Ives Shop 6
Jory Works 7 Keep Jory Works 7 $11,108.57 The dollar is the profit already on Jory Works 7. Jory Works 7
Keel Yard 8 Keep Keel Yard 8 $11,108.57 The dollar is the profit already on Keel Yard 8. Keel Yard 8
Lark Plant 9 Keep Lark Plant 9 $11,108.57 The dollar is the profit already on Lark Plant 9. Lark Plant 9
Moss Mill 10 Keep Moss Mill 10 $11,108.57 The dollar is the profit already on Moss Mill 10. Moss Mill 10
Nash Line 11 Keep Nash Line 11 $11,108.57 The dollar is the profit already on Nash Line 11. Nash Line 11
Oran Supply 12 Keep Oran Supply 12 $11,108.57 The dollar is the profit already on Oran Supply 12. Oran Supply 12
Custom one-off ads flight 48 Keep Custom one-off ads flight 48 inside the budget on the file $11,040.00 The dollar is the spend already on Custom one-off ads flight 48. Custom one-off ads flight 48
Trade shows flight 41 Keep Trade shows flight 41 inside the budget on the file $10,800.00 The dollar is the spend already on Trade shows flight 41. Trade shows flight 41
Late catalog flight 29 Keep Late catalog flight 29 inside the budget on the file $10,530.00 The dollar is the spend already on Late catalog flight 29. Late catalog flight 29
Paid search flight 7 Keep Paid search flight 7 inside the budget on the file $10,175.00 The dollar is the spend already on Paid search flight 7. Paid search flight 7
Application content flight 12 Keep Application content flight 12 inside the budget on the file $9,660.00 The dollar is the spend already on Application content flight 12. Application content flight 12
Trade shows flight 31 Keep Trade shows flight 31 inside the budget on the file $9,540.00 The dollar is the spend already on Trade shows flight 31. Trade shows flight 31
Custom one-off ads flight 38 Keep Custom one-off ads flight 38 inside the budget on the file $9,360.00 The dollar is the spend already on Custom one-off ads flight 38. Custom one-off ads flight 38
Print flight 6 Keep Print flight 6 inside the budget on the file $9,212.50 The dollar is the spend already on Print flight 6. Print flight 6
Late catalog flight 19 Keep Late catalog flight 19 inside the budget on the file $8,640.00 The dollar is the spend already on Late catalog flight 19. Late catalog flight 19
Trade shows flight 21 Keep Trade shows flight 21 inside the budget on the file $8,280.00 The dollar is the spend already on Trade shows flight 21. Trade shows flight 21
Engineer email flight 5 Keep Engineer email flight 5 inside the budget on the file $8,250.00 The dollar is the spend already on Engineer email flight 5. Engineer email flight 5
Paid search flight 47 Keep Paid search flight 47 inside the budget on the file $8,190.00 The dollar is the spend already on Paid search flight 47. Paid search flight 47
Custom one-off ads flight 28 Keep Custom one-off ads flight 28 inside the budget on the file $7,680.00 The dollar is the spend already on Custom one-off ads flight 28. Custom one-off ads flight 28
Trade shows flight 11 Keep Trade shows flight 11 inside the budget on the file $7,020.00 The dollar is the spend already on Trade shows flight 11. Trade shows flight 11
Paid search Shift spend off Paid search $6,936.54 Paid search costs more per lead than the channels on this file. The dollar is that extra spend. Paid search
Distributor partners Shift spend off Distributor partners $6,762.21 Distributor partners costs more per lead than the channels on this file. The dollar is that extra spend. Distributor partners
Paid search flight 37 Keep Paid search flight 37 inside the budget on the file $6,720.00 The dollar is the spend already on Paid search flight 37. Paid search flight 37
Print Shift spend off Print $6,477.77 Print costs more per lead than the channels on this file. The dollar is that extra spend. Print
Engineer email Shift spend off Engineer email $6,090.11 Engineer email costs more per lead than the channels on this file. The dollar is that extra spend. Engineer email
Print flight 46 Keep Print flight 46 inside the budget on the file $5,760.00 The dollar is the spend already on Print flight 46. Print flight 46
Custom one-off ads Shift spend off Custom one-off ads $5,718.51 Custom one-off ads costs more per lead than the channels on this file. The dollar is that extra spend. Custom one-off ads
Specification library Shift spend off Specification library $4,982.20 Specification library costs more per lead than the channels on this file. The dollar is that extra spend. Specification library
Tests Shift spend off Tests $4,959.27 Tests costs more per lead than the channels on this file. The dollar is that extra spend. Tests
Standard line 18 Stop spend aimed at Standard line 18 $4,838.40 Standard line 18 loses money. The dollar is that loss on this row. Standard line 18
Late catalog Shift spend off Late catalog $4,500.49 Late catalog costs more per lead than the channels on this file. The dollar is that extra spend. Late catalog
Engineer email flight 45 Bring Engineer email flight 45 back to the budget on the file $4,400.00 Engineer email flight 45 is past its budget. The dollar is spend minus that budget. Engineer email flight 45
Standard line 17 Stop spend aimed at Standard line 17 $4,233.60 Standard line 17 loses money. The dollar is that loss on this row. Standard line 17
Engineer email flight 35 Bring Engineer email flight 35 back to the budget on the file $4,050.00 Engineer email flight 35 is past its budget. The dollar is spend minus that budget. Engineer email flight 35
Engineer email flight 25 Bring Engineer email flight 25 back to the budget on the file $3,700.00 Engineer email flight 25 is past its budget. The dollar is spend minus that budget. Engineer email flight 25
Engineer email flight 15 Bring Engineer email flight 15 back to the budget on the file $3,350.00 Engineer email flight 15 is past its budget. The dollar is spend minus that budget. Engineer email flight 15
Distributor partners flight 4 Bring Distributor partners flight 4 back to the budget on the file $3,180.00 Distributor partners flight 4 is past its budget. The dollar is spend minus that budget. Distributor partners flight 4
Standard line 10 Keep Standard line 10 $3,024.00 The dollar is the profit already on Standard line 10. Standard line 10
Standard line 11 Keep Standard line 11 $3,024.00 The dollar is the profit already on Standard line 11. Standard line 11
Standard line 12 Keep Standard line 12 $3,024.00 The dollar is the profit already on Standard line 12. Standard line 12
Standard line 13 Keep Standard line 13 $3,024.00 The dollar is the profit already on Standard line 13. Standard line 13
Standard line 14 Keep Standard line 14 $3,024.00 The dollar is the profit already on Standard line 14. Standard line 14
Standard line 15 Keep Standard line 15 $3,024.00 The dollar is the profit already on Standard line 15. Standard line 15
Standard line 16 Keep Standard line 16 $3,024.00 The dollar is the profit already on Standard line 16. Standard line 16
Standard line 7 Keep Standard line 7 $3,024.00 The dollar is the profit already on Standard line 7. Standard line 7
Standard line 8 Keep Standard line 8 $3,024.00 The dollar is the profit already on Standard line 8. Standard line 8
Standard line 9 Keep Standard line 9 $3,024.00 The dollar is the profit already on Standard line 9. Standard line 9
Tests flight 50 Bring Tests flight 50 back to the budget on the file $3,000.00 Tests flight 50 is past its budget. The dollar is spend minus that budget. Tests flight 50
Specification library flight 3 Bring Specification library flight 3 back to the budget on the file $2,760.00 Specification library flight 3 is past its budget. The dollar is spend minus that budget. Specification library flight 3
Tests flight 40 Bring Tests flight 40 back to the budget on the file $2,650.00 Tests flight 40 is past its budget. The dollar is spend minus that budget. Tests flight 40
Application content flight 2 Bring Application content flight 2 back to the budget on the file $2,340.00 Application content flight 2 is past its budget. The dollar is spend minus that budget. Application content flight 2
Tests flight 30 Bring Tests flight 30 back to the budget on the file $2,300.00 Tests flight 30 is past its budget. The dollar is spend minus that budget. Tests flight 30
Tests flight 20 Bring Tests flight 20 back to the budget on the file $1,950.00 Tests flight 20 is past its budget. The dollar is spend minus that budget. Tests flight 20
Trade shows flight 1 Bring Trade shows flight 1 back to the budget on the file $1,920.00 Trade shows flight 1 is past its budget. The dollar is spend minus that budget. Trade shows flight 1
Tests flight 10 Bring Tests flight 10 back to the budget on the file $1,600.00 Tests flight 10 is past its budget. The dollar is spend minus that budget. Tests flight 10

Cost per lead

Jan 15–Dec 15, 2025. Cost per lead by channel on the current book. Each bar is spend divided by known leads. A channel with no lead count stays off. The longest bar is the highest cost.Tests$560Late catalog$494Custom one-off ads$420Paid search$391Print$373Engineer email$323Distributor partners$287Specification library$255Application content$218Trade shows$179
  1. Tests · $560
  2. Late catalog · $494
  3. Custom one-off ads · $420
  4. Paid search · $391
  5. Print · $373
  6. Engineer email · $323
  7. Distributor partners · $287
  8. Specification library · $255
  9. Application content · $218
  10. Trade shows · $179
Jan 15–Dec 15, 2025. Cost per lead by channel on the current book. Each bar is spend divided by known leads. A channel with no lead count stays off. The longest bar is the highest cost. ?

? Each bar is one channel. The length is that channel's cost per lead beside the highest cost on this book. The dollar is spend divided by known leads. A blank lead count stays off the chart. A channel with no spend and a known lead count shows as zero. Nothing on this chart posts.

Sourced and attributed

Jan 15–Dec 15, 2025. Sourced pipeline and attributed profit on the current book. Each pair is one channel. Sourced is the sourced dollar on the channel. Attributed is approved profit tied to that channel. A blank sourced dollar stays off. The longest bar is the highest dollar.Sourced · Trade shows$64.0KAttributed · Trade sho$617.4KSourced · Application $12.0KAttributed · Applicati$441.0KAttributed · Engineer $29.4KAttributed · Paid sear$23.5KAttributed · Custom on$17.6KAttributed · Specifica$17.6KAttributed · Tests$11.8KAttributed · Distribut$11.8KAttributed · Late cata$11.8K
  1. Sourced · Trade shows · $64.0K
  2. Attributed · Trade shows · $617.4K
  3. Sourced · Application content · $12.0K
  4. Attributed · Application content · $441.0K
  5. Attributed · Engineer email · $29.4K
  6. Attributed · Paid search · $23.5K
  7. Attributed · Custom one-off ads · $17.6K
  8. Attributed · Specification library · $17.6K
  9. Attributed · Tests · $11.8K
  10. Attributed · Distributor partners · $11.8K
  11. Attributed · Late catalog · $11.8K
Jan 15–Dec 15, 2025. Sourced pipeline and attributed profit on the current book. Each pair is one channel. Sourced is the sourced dollar on the channel. Attributed is approved profit tied to that channel. A blank sourced dollar stays off. The longest bar is the highest dollar. ?

? Sourced is the pipeline dollar stored on the channel. Attributed is approved profit tied to that same channel. When a sourced dollar is on the file and no win is approved, attributed shows as zero. A blank sourced dollar stays off the chart. Nothing on this chart posts.

Which channel holds the profit

Jan 15–Dec 15, 2025. Attributed profit by channel. Each bar is one channel. The dollar is approved attributed profit on that channel. A blank dollar stays off. A channel marked unknown stays off. The longest bar holds the most profit. Nothing posts.Trade shows$617.4KApplication content$441.0KEngineer email$29.4KPaid search$23.5KCustom one-off ads$17.6KSpecification library$17.6KTests$11.8KDistributor partners$11.8K
  1. Trade shows · $617.4K
  2. Application content · $441.0K
  3. Engineer email · $29.4K
  4. Paid search · $23.5K
  5. Custom one-off ads · $17.6K
  6. Specification library · $17.6K
  7. Tests · $11.8K
  8. Distributor partners · $11.8K
Jan 15–Dec 15, 2025. Attributed profit by channel. Each bar is one channel. The dollar is approved attributed profit on that channel. A blank dollar stays off. A channel marked unknown stays off. The longest bar holds the most profit. Nothing posts. ?

1 more channel holds profit. It stays on the file.

? Each bar is one channel. The length is that channel's approved attributed profit beside the largest on this chart. A blank dollar stays off. A channel marked unknown stays off. The chart shows the eight largest. The rest stay on the file. The dollar does not post.

5 of 14 slices hold the Core profit. 77% of marketing spend is on Core, 2% on the tail.

Jan 15–Dec 15, 2025 · planned pipeline, actual, and variance

Not started Planned $117.2K ?. Actual Not recorded ?. Variance Not recorded ?.

Marketing. Planned $117.2K. Actual Not recorded. Variance Not recorded. Sourced pipeline $24.2M. Profit created $1.2M. Channel ROI 2.81. Spend is not the Profit Bridge number. Jan 15–Dec 15, 2025. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

Plan is approved pipeline the channel sourced. Spend is not that dollar. Sales forecast dollars are not added. A blank cell stays unknown.

Demand follows profit

Put the spend on the slices that hold the profit. Core gets the campaigns. The tail, and any work that loses money, does not. A campaign aimed at the tail needs a written exception before it can go live.

Channel ROI

Channel ROI is profit created divided by spend. It is a reading. It is not a Profit Bridge dollar. Cost per lead is a reading too. A thin history says there are not enough wins yet.

Pipeline and approved impact

Pipeline is a leading measure. A pipeline dollar never changes the Profit Bridge. Approved Profit Bridge impact is a sourced dollar, and it posts only after a person approves it. A dollar already on Sales is kept for the ROI reading and is not added again.

Pipeline. $24.2M. Pipeline is not on the Profit Bridge.

Approved Profit Bridge impact. $117.2K. Approved Profit Bridge impact posts only after a person approves it. On the Profit Bridge: $117.2K from 3 approved attributed wins.

Profit created $1.2M ?.

Next review 2026-11-16. Channel ROI 2.81 ?.

This book · the counts on the file · not a week or a month ?

  • On track In motion. Channels with spend. Now 10. Goal Two or more before concentration.
  • Not started In motion. Leads still unknown. Now 0. Goal A count, or left blank.
  • Watch After the file. Approved Profit Bridge impact. Now $117.2K. Goal Named, not copied from Sales.
  • Not started After the file. Recorded on the next file. Now Not recorded. Goal The later pipeline cell.

In motion is a count on this book: channels with spend, and leads still unknown. After the file is the approved sourced pipeline and the later recorded pipeline. Spend is not that dollar. Nothing here posts until you approve.

  • Trade shows. Spend $147.0K. Pipeline $10.2M. Approved Profit Bridge impact $64.0K.
  • Application content. Spend $105.0K. Pipeline $6.3M. Approved Profit Bridge impact Not on the bridge.
  • Specification library. Spend $50.4K. Pipeline $2.7M. Approved Profit Bridge impact Not on the bridge.
  • Distributor partners. Spend $33.6K. Pipeline $1.7M. Approved Profit Bridge impact Not on the bridge.
  • Engineer email. Spend $21.0K. Pipeline $954.0K. Approved Profit Bridge impact Not on the bridge.
  • Print. Spend $16.8K. Pipeline $685.4K. Approved Profit Bridge impact Not on the bridge.
  • Paid search. Spend $16.8K. Pipeline $678.7K. Approved Profit Bridge impact Not on the bridge.
  • Custom one-off ads. Spend $12.6K. Pipeline $490.1K. Approved Profit Bridge impact Not on the bridge.
  • Late catalog. Spend $8.4K. Pipeline $287.2K. Approved Profit Bridge impact Not on the bridge.
  • Tests. Spend $8.4K. Pipeline $261.7K. Approved Profit Bridge impact Not on the bridge.

Marketing draft

Draft only. Nothing is sent.

? 2026-10. No channel names a cost-per-lead ceiling. The cost-per-lead lines use the months already on the file. A channel test stays a draft. Nothing is emailed.

Receipts

  • 2026-11-01T12:00:00+00:00 · Nina Pell · Loaded the company. Nothing was sent.

Lessons

  • Marketing: count the whole spend, hold every channel to a ceiling, and know what marketing really brings in

    Text lesson

    Count the whole marketing spend, hold every channel to a ceiling, and see what marketing brings in.

  • The 80/20 Marketer, Ch. 11 Count All the Money

    Book chapter

    Count all the money, not one campaign at a time.

    Book ?

  • The 80/20 Marketer, Ch. 12 Where to Show Up

    Book chapter

    Choose where to show up, and hold each channel to a ceiling.

    Book ?

  • The 80/20 Marketer, Ch. 13 Test Your Favorite

    Book chapter

    Test the channel you like before you fund more of it.

    Book ?

  • The 80/20 Marketer, Ch. 3 Find the Fort's Wallet

    Book chapter

    Find the customers who hold the profit.

    Book ?

  • The 80/20 Marketer, Ch. 15 The Marketing Month

    Book chapter

    A monthly marketing rhythm.

    Book ?

  • Channel Effectiveness Review Exercise

    Text lesson

    Look back at how each channel performed over the year.

    Watch ?

Written lesson

Count all the money: whole marketing spend

Add every dollar that asks for a lead: people, events, ads, and the agency. One campaign line is not the spend.

The 80/20 Marketer

Written lesson

Test your favorite before you fund it

Run the channel you like on a small dollar and a date. Read the result. Then decide.

The 80/20 Marketer

Written lesson

Sourced versus attributed: what marketing really brings in

Sourced means marketing opened the door. Attributed means the deal closed and someone can point at the campaign. Do not mix the two dollars.

The 80/20 Marketer

Download this page as PDF, Word, or PowerPoint. You print it yourself. PGOS does not mail it.

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

Open Profit Bridge

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

See which offer is pulling demand ?

Marketing is which offer people ask for, not a pile of campaigns.

Marketing

This page shows where demand comes from, and which of it earns.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.