Help
How to use PGOS
Download

Latest year in this book.

Lean Book
You
Theme
Light or dark
Language Sign in
Sample: Larkspur Precision

Sample company: Larkspur Precision. These aren't your numbers. See an example: Distributor

Other examples

Regional distributor HVAC and plumbing Coaching

Lean is the step that limits the rest of the work. Fix that step before you add people.

Board page

On time and quality

? The same standard as the board pack, for July 2026–September 2026.

Board pack. Earnings are $6,230 behind plan. −$6,230. July 2026–September 2026. File period Jan 15–Dec 15, 2025. The pages in this pack use this quarter. They are not added again. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

On time and first-pass quality, April–September 2026. Goal 95% on time and 98% quality.

Apr to Sep · on time and quality · one point per month. On time (percent), Quality (percent)AprMayJunJulAugSepApr · On time · percent · 91.00May · On time · percent · 92.00Jun · On time · percent · 90.00Jul · On time · percent · 93.00Aug · On time · percent · 94.00Sep · On time · percent · 95.00Apr · Quality · percent · 97.00May · Quality · percent · 97.00Jun · Quality · percent · 96.00Jul · Quality · percent · 98.00Aug · Quality · percent · 98.00Sep · Quality · percent · 98.00
  1. Apr · On time · percent · 91.00
  2. May · On time · percent · 92.00
  3. Jun · On time · percent · 90.00
  4. Jul · On time · percent · 93.00
  5. Aug · On time · percent · 94.00
  6. Sep · On time · percent · 95.00
  7. Apr · Quality · percent · 97.00
  8. May · Quality · percent · 97.00
  9. Jun · Quality · percent · 96.00
  10. Jul · Quality · percent · 98.00
  11. Aug · Quality · percent · 98.00
  12. Sep · Quality · percent · 98.00
Apr to Sep · on time and quality · one point per month ?
  • Apr: on time 91%, quality 97%.
  • May: on time 92%, quality 97%.
  • Jun: on time 90%, quality 96%.
  • Jul: on time 93%, quality 98%.
  • Aug: on time 94%, quality 98%.
  • Sep: on time 95%, quality 98%.

Open this page in the board pack

This file · running with no plan

3 ?

Running with no plan means the work has started and has no measurement plan yet. These counts are not dollars.

Open the flow ?

This opens the flow of the work. Nothing is saved, and nothing is sent.

Lean Operations

Larkspur Precision

Standard skid lines hold the profit and have a named bottleneck. Custom one-offs hurt flow.

Find the waste and the bottleneck in the flow. Put standard work and a daily board on the few streams that hold the profit. An improvement event is a charter with an owner and a date, tied to the Critical Few. Operating measures are not dollars. Only an approved, measured savings reaches the Profit Bridge, and it is never a Cost Reduction cut or a Procurement save.

Done when you can read the Core streams, the named bottleneck, the measures off track, the Profit Bridge line, and the next review date.

Lines to look at ?

Each card is one stream, one open waste, or one improvement event. The dollar is the profit the stream already supports, the event dollar already named, or the gap against the later record. A card with no dollar says Not in the file. Accept notes the line. It does not post the dollar.

These are what we believe based on the data you gave us. Verify each line. You decide.

Suggestions. Nothing here is posted until you accept a line.
What to look at Suggested action Dollar Why Source rows Decide
Standard skid line · Queue Clear Queue on Standard skid line $4,200,000.00 The bottleneck on Standard skid line is Queue. The dollar is the profit this stream already supports. Standard skid line · Queue
Second skid line · Queue Clear Queue on Second skid line $2,300,000.00 The bottleneck on Second skid line is Queue. The dollar is the profit this stream already supports. Second skid line · Queue
Valve cell · Queue Clear Queue on Valve cell $1,250,000.00 The bottleneck on Valve cell is Queue. The dollar is the profit this stream already supports. Valve cell · Queue
Frame cell Name the bottleneck on Frame cell $840,000.00 Frame cell has no named bottleneck. The dollar is the profit this stream already supports. Frame cell
Weld flow · Queue Clear Queue on Weld flow $730,000.00 The bottleneck on Weld flow is Queue. The dollar is the profit this stream already supports. Weld flow · Queue
Assembly flow · Queue Clear Queue on Assembly flow $520,000.00 The bottleneck on Assembly flow is Queue. The dollar is the profit this stream already supports. Assembly flow · Queue
Custom one-offs · Queue Clear Queue on Custom one-offs $410,000.00 The bottleneck on Custom one-offs is Queue. The dollar is the profit this stream already supports. Custom one-offs · Queue
Spare parts cell Name the bottleneck on Spare parts cell $210,000.00 Spare parts cell has no named bottleneck. The dollar is the profit this stream already supports. Spare parts cell
Show the rest (65)
The rest of the suggestions. Nothing here is posted until you accept a line.
What to look at Suggested action Dollar Why Source rows Decide
Improve assembly flow 22 Record the later dollar on Improve assembly flow 22 $22,323.96 The event is done. The later record is blank. The dollar is the event dollar already named. Improve assembly flow 22
Improve weld flow 21 Record the later dollar on Improve weld flow 21 $19,330.12 The event is done. The later record is blank. The dollar is the event dollar already named. Improve weld flow 21
Improve standard skid line 9 Finish Improve standard skid line 9 $9,000.00 Improve standard skid line 9 is scheduled. The dollar is the event dollar already named. Improve standard skid line 9
Improve custom one-offs 7 Finish Improve custom one-offs 7 $8,750.00 Improve custom one-offs 7 is scheduled. The dollar is the event dollar already named. Improve custom one-offs 7
Improve weld flow 5 Finish Improve weld flow 5 $8,500.00 Improve weld flow 5 is scheduled. The dollar is the event dollar already named. Improve weld flow 5
Improve valve cell 3 Finish Improve valve cell 3 $8,250.00 Improve valve cell 3 is idea. The dollar is the event dollar already named. Improve valve cell 3
Improve standard skid line 1 Finish Improve standard skid line 1 $8,000.00 Improve standard skid line 1 is idea. The dollar is the event dollar already named. Improve standard skid line 1
Improve valve cell 19 Close the gap on Improve valve cell 19 $1,636.19 The later record is below the event dollar. The dollar is that gap. Improve valve cell 19
Improve second skid line 18 Close the gap on Improve second skid line 18 $1,277.44 The later record is below the event dollar. The dollar is that gap. Improve second skid line 18
Improve standard skid line 17 Close the gap on Improve standard skid line 17 $787.15 The later record is below the event dollar. The dollar is that gap. Improve standard skid line 17
Improve frame cell 20 Close the gap on Improve frame cell 20 $780.44 The later record is below the event dollar. The dollar is that gap. Improve frame cell 20
Assembly flow · Assembly flow release Watch Assembly flow release on Assembly flow Not in the file Assembly flow release is named on Assembly flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-6-step-1

No number to accept. The file does not support the math.

Assembly flow · Check Cut the wait on Check on Assembly flow Not in the file Check is named on Assembly flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-6-step-4

No number to accept. The file does not support the math.

Assembly flow · Do the work Watch Do the work on Assembly flow Not in the file Do the work is named on Assembly flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-6-step-3

No number to accept. The file does not support the math.

Assembly flow · Hand off Cut the wait on Hand off on Assembly flow Not in the file Hand off is named on Assembly flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-6-step-5

No number to accept. The file does not support the math.

Custom one-offs · Check Cut the wait on Check on Custom one-offs Not in the file Check is named on Custom one-offs. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-7-step-4

No number to accept. The file does not support the math.

Custom one-offs · Custom one-offs release Watch Custom one-offs release on Custom one-offs Not in the file Custom one-offs release is named on Custom one-offs. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-7-step-1

No number to accept. The file does not support the math.

Custom one-offs · Do the work Watch Do the work on Custom one-offs Not in the file Do the work is named on Custom one-offs. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-7-step-3

No number to accept. The file does not support the math.

Custom one-offs · Hand off Cut the wait on Hand off on Custom one-offs Not in the file Hand off is named on Custom one-offs. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-7-step-5

No number to accept. The file does not support the math.

extra motion · Spare parts cell release Close the extra motion on Spare parts cell Not in the file extra motion is still open on Spare parts cell. Spare parts cell · Spare parts cell release · extra motion
extra stock · Check Close the extra stock on Valve cell Not in the file extra stock is still open on Valve cell. Valve cell · Check · extra stock
Frame cell · Check Cut the wait on Check on Frame cell Not in the file Check is named on Frame cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-4-step-4

No number to accept. The file does not support the math.

Frame cell · Do the work Watch Do the work on Frame cell Not in the file Do the work is named on Frame cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-4-step-3

No number to accept. The file does not support the math.

Frame cell · Frame cell release Watch Frame cell release on Frame cell Not in the file Frame cell release is named on Frame cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-4-step-1

No number to accept. The file does not support the math.

Frame cell · Hand off Cut the wait on Hand off on Frame cell Not in the file Hand off is named on Frame cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-4-step-5

No number to accept. The file does not support the math.

Frame cell · Queue Cut the wait on Queue on Frame cell Not in the file Queue is named on Frame cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-4-step-2

No number to accept. The file does not support the math.

Improve assembly flow 14 Finish Improve assembly flow 14 Not in the file Improve assembly flow 14 is running. Improve assembly flow 14
Improve assembly flow 6 Finish Improve assembly flow 6 Not in the file Improve assembly flow 6 is scheduled. Improve assembly flow 6
Improve custom one-offs 15 Finish Improve custom one-offs 15 Not in the file Improve custom one-offs 15 is running. Improve custom one-offs 15
Improve frame cell 12 Finish Improve frame cell 12 Not in the file Improve frame cell 12 is running. Improve frame cell 12
Improve frame cell 4 Finish Improve frame cell 4 Not in the file Improve frame cell 4 is idea. Improve frame cell 4
Improve second skid line 10 Finish Improve second skid line 10 Not in the file Improve second skid line 10 is scheduled. Improve second skid line 10
Improve second skid line 2 Finish Improve second skid line 2 Not in the file Improve second skid line 2 is idea. Improve second skid line 2
Improve spare parts cell 16 Finish Improve spare parts cell 16 Not in the file Improve spare parts cell 16 is running. Improve spare parts cell 16
Improve spare parts cell 8 Finish Improve spare parts cell 8 Not in the file Improve spare parts cell 8 is scheduled. Improve spare parts cell 8
Improve valve cell 11 Finish Improve valve cell 11 Not in the file Improve valve cell 11 is running. Improve valve cell 11
Improve weld flow 13 Finish Improve weld flow 13 Not in the file Improve weld flow 13 is running. Improve weld flow 13
movement · Hand off Close the movement on Second skid line Not in the file movement is still open on Second skid line. Second skid line · Hand off · movement
over-processing · Do the work Close the over-processing on Weld flow Not in the file over-processing is still open on Weld flow. Weld flow · Do the work · over-processing
over-production · Queue Close the over-production on Assembly flow Not in the file over-production is still open on Assembly flow. Assembly flow · Queue · over-production
rework or defects · Check Close the rework or defects on Frame cell Not in the file rework or defects is still open on Frame cell. Frame cell · Check · rework or defects
Second skid line · Check Cut the wait on Check on Second skid line Not in the file Check is named on Second skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-2-step-4

No number to accept. The file does not support the math.

Second skid line · Do the work Watch Do the work on Second skid line Not in the file Do the work is named on Second skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-2-step-3

No number to accept. The file does not support the math.

Second skid line · Hand off Cut the wait on Hand off on Second skid line Not in the file Hand off is named on Second skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-2-step-5

No number to accept. The file does not support the math.

Second skid line · Second skid line release Watch Second skid line release on Second skid line Not in the file Second skid line release is named on Second skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-2-step-1

No number to accept. The file does not support the math.

Spare parts cell · Check Cut the wait on Check on Spare parts cell Not in the file Check is named on Spare parts cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-8-step-4

No number to accept. The file does not support the math.

Spare parts cell · Do the work Watch Do the work on Spare parts cell Not in the file Do the work is named on Spare parts cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-8-step-3

No number to accept. The file does not support the math.

Spare parts cell · Hand off Cut the wait on Hand off on Spare parts cell Not in the file Hand off is named on Spare parts cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-8-step-5

No number to accept. The file does not support the math.

Spare parts cell · Queue Cut the wait on Queue on Spare parts cell Not in the file Queue is named on Spare parts cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-8-step-2

No number to accept. The file does not support the math.

Spare parts cell · Spare parts cell release Watch Spare parts cell release on Spare parts cell Not in the file Spare parts cell release is named on Spare parts cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-8-step-1

No number to accept. The file does not support the math.

Standard skid line · Check Cut the wait on Check on Standard skid line Not in the file Check is named on Standard skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-1-step-4

No number to accept. The file does not support the math.

Standard skid line · Do the work Watch Do the work on Standard skid line Not in the file Do the work is named on Standard skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-1-step-3

No number to accept. The file does not support the math.

Standard skid line · Hand off Cut the wait on Hand off on Standard skid line Not in the file Hand off is named on Standard skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-1-step-5

No number to accept. The file does not support the math.

Standard skid line · Standard skid line release Watch Standard skid line release on Standard skid line Not in the file Standard skid line release is named on Standard skid line. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-1-step-1

No number to accept. The file does not support the math.

unused skill · Queue Close the unused skill on Custom one-offs Not in the file unused skill is still open on Custom one-offs. Custom one-offs · Queue · unused skill
Valve cell · Check Cut the wait on Check on Valve cell Not in the file Check is named on Valve cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-3-step-4

No number to accept. The file does not support the math.

Valve cell · Do the work Watch Do the work on Valve cell Not in the file Do the work is named on Valve cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-3-step-3

No number to accept. The file does not support the math.

Valve cell · Hand off Cut the wait on Hand off on Valve cell Not in the file Hand off is named on Valve cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-3-step-5

No number to accept. The file does not support the math.

Valve cell · Valve cell release Watch Valve cell release on Valve cell Not in the file Valve cell release is named on Valve cell. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-3-step-1

No number to accept. The file does not support the math.

waiting · Hand off Close the waiting on Standard skid line Not in the file waiting is still open on Standard skid line. Standard skid line · Hand off · waiting
waiting · Standard skid line release Close the waiting on Standard skid line Not in the file waiting is still open on Standard skid line. Standard skid line · Standard skid line release · waiting
Weld flow · Check Cut the wait on Check on Weld flow Not in the file Check is named on Weld flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-5-step-4

No number to accept. The file does not support the math.

Weld flow · Do the work Watch Do the work on Weld flow Not in the file Do the work is named on Weld flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-5-step-3

No number to accept. The file does not support the math.

Weld flow · Hand off Cut the wait on Hand off on Weld flow Not in the file Hand off is named on Weld flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-5-step-5

No number to accept. The file does not support the math.

Weld flow · Weld flow release Watch Weld flow release on Weld flow Not in the file Weld flow release is named on Weld flow. It has no dollar of its own. The stream dollar stays on the bottleneck. stream-5-step-1

No number to accept. The file does not support the math.

4 of 8 streams support 82% of known profit. ?

The bottleneck on Standard skid line is Queue. ?

On track 0 measures are off track.

This file · the events on the file · not a week or a month ?

Open improvement events: 16. Running with no measurement plan: 3.

Open events are improvement events still open on this file. Running with no measurement plan is work that has no plan yet. These counts are not a week or a month. These counts are not dollars.

On the Profit Bridge: $96.0K from 4 posted savings. ?

Next review date: 2026-11-16

Owner Reed Cedar. Weekly 2026-11-16.

Three things to fix this week

How to run the work

  • Rank the streams that hold the profit. Name the sites, lines, warehouses, or crews. Rank them by the profit they support. The Core is the few streams that hold the profit. A stream with no profit figure stays unknown.
  • Walk the flow. Write the steps you can see: work time, wait time, and work in process. Mark the bottleneck. If the steps are missing, the stream still opens and says so. The picture invents no times.
  • Name the waste in plain words. Waiting, movement, extra stock, rework, over-processing, over-production, unused skill, and extra motion. Each note has a stream, an owner, and a date. A note becomes an improvement event only when a person types the charter.
  • Write the standard and stand up the board. The current best way on a Core stream has a pace, an owner, and a review date. The daily board shows today's measures, today's problems, and today's actions. A missed review is a flag. Neither one is a dollar.
  • Charter the improvement event. The event has a problem, a target, an owner, a date, and a plan for how the savings will be measured. Tie it to a Critical Few objective when one exists. The lesson for this work is Kaizen.
  • Approve only a measured savings. An expected dollar is a check. It posts on the new path only after it is measured, approved by the lean owner, and not already a Cost Reduction cut or a Procurement save. Operating measures are never turned into a dollar.

Plan versus actual

Jan 15–Dec 15, 2025 · planned kaizen, actual, and variance ?

On track Planned $96.0K ?. Actual $73.7K ?. Variance −$22.3K ?.

Lean Operations. 4 of 8 streams support 82% of known profit. The bottleneck on Standard skid line is Queue. Planned $96.0K. Actual $73.7K. Variance −$22.3K. On the Profit Bridge: $96.0K from 4 posted savings. A kaizen dollar is separate from Cost Reduction and Procurement. Jan 15–Dec 15, 2025.

Plan is an approved kaizen dollar. Operating measures are not turned into dollars. Cost Reduction and Procurement are not added. A blank actual stays unrecorded.

Which stream holds the profit

Jan 15–Dec 15, 2025. Profit supported by each stream on the current book. Each bar is one stream. A stream with no profit figure stays off. The longest bar holds the most profit.Standard skid line$4.2MSecond skid line$2.3MValve cell$1.2MFrame cell$840.0KWeld flow$730.0KAssembly flow$520.0KCustom one-offs$410.0KSpare parts cell$210.0K
  1. Standard skid line · $4.2M
  2. Second skid line · $2.3M
  3. Valve cell · $1.2M
  4. Frame cell · $840.0K
  5. Weld flow · $730.0K
  6. Assembly flow · $520.0K
  7. Custom one-offs · $410.0K
  8. Spare parts cell · $210.0K
Jan 15–Dec 15, 2025. Profit supported by each stream on the current book. Each bar is one stream. A stream with no profit figure stays off. The longest bar holds the most profit. ?

? Each bar is the profit the stream is tied to. It is not a Lean dollar, and it does not post. A stream with no profit figure stays off. A known zero stays on the chart. The longest bar holds the most profit.

Which step holds the wait

The days on this flow. Wait at each step. Each bar is one step. A step with no wait figure stays off. A loss stays off. The longest bar holds the most wait. Nothing here posts.Custom one-offs · Queu48Weld flow · Queue48Assembly flow · Queue18Frame cell · Queue18Second skid line · Que18Spare parts cell · Que18Standard skid line · Q18Valve cell · Queue18
  1. Custom one-offs · Queue · 48
  2. Weld flow · Queue · 48
  3. Assembly flow · Queue · 18
  4. Frame cell · Queue · 18
  5. Second skid line · Queue · 18
  6. Spare parts cell · Queue · 18
  7. Standard skid line · Queue · 18
  8. Valve cell · Queue · 18
The days on this flow. Wait at each step. Each bar is one step. A step with no wait figure stays off. A loss stays off. The longest bar holds the most wait. Nothing here posts. ?

? Each bar is the wait already typed for that step. The unit is the one you typed. This page does not invent one. A blank wait stays off. It is not stored as zero. A loss stays off. A known zero stays on the chart. The longest bar holds the most wait. The chart shows the eight largest. The rest stay on the flow. Nothing posts.

32 more steps have a wait. They stay on the flow.

  • On track Core Standard skid line
  • On track Core Second skid line
  • On track Core Valve cell
  • On track Core Frame cell
  • Watch Middle Weld flow
  • Watch Middle Assembly flow
  • Watch Middle Custom one-offs
  • Not started Tail Spare parts cell
Older board

Standard skid line

Second skid line

Valve cell

Frame cell

Weld flow

Assembly flow

Custom one-offs

Spare parts cell

Add a value stream

Improvement events

Improve standard skid line 1 Not on the bridge

Improve second skid line 2 Not on the bridge

Improve valve cell 3 Not on the bridge

Improve frame cell 4 Not on the bridge

Improve weld flow 5 Not on the bridge

Improve assembly flow 6 Not on the bridge

Improve custom one-offs 7 Not on the bridge

Improve spare parts cell 8 Not on the bridge

Improve standard skid line 9 Not on the bridge

Improve second skid line 10 Not on the bridge

Improve valve cell 11 Not on the bridge

Improve frame cell 12 Not on the bridge

Improve weld flow 13 Not on the bridge

Improve assembly flow 14 Not on the bridge

Improve custom one-offs 15 Not on the bridge

Improve spare parts cell 16 Not on the bridge

Improve standard skid line 17 $18.6K

Improve second skid line 18 $26.6K

Improve valve cell 19 $32.1K

Improve frame cell 20 Not on the bridge

Improve weld flow 21 Not on the bridge

Improve assembly flow 22 $22.3K

Improve custom one-offs 23 Not on the bridge

Improve spare parts cell 24 Not on the bridge

Add an improvement event

Signing does not add a dollar.

Receipts

  • 2026-11-01T15:00:00+00:00 · Reed Cedar · Signed the lean reading. No dollars were added. Signed by Reed Cedar.

Teaching

Written lesson

Fix the constraint you can see

Name the step that sets the pace. Improve that step. A project on a step that is not the constraint will not move the promise date.

Cost Is a Choice

Download this page as PDF, Word, or PowerPoint. You print it yourself. PGOS does not mail it.

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

Open Profit Bridge

Open the constraint ?

The constraint is the step that limits the rest of the work.

Lean Operations

This page is the flow, the waste, and the next improvement.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.