Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.
? Sales for the period. Up is better. This is the file on the company, not a goal.
Your three priorities this quarter: 2 on pace, 0 to watch, 1 missed the latest check-in, 0 have not begun. This quarter: 0 of 3.
Process Library
Write how the work is done here, in steps a new person can follow. Name an owner and a review date. When the date comes due, review the process. A team confirms whether it is followed. That answer is the health of the process.
This company is on Pro. The library holds 200 live processes. Change history keeps 36 versions. Video, images, and attachments are included. Drafts from notes: 60 this month. Onboarding checklists are included. The follow check and the health score stay on every plan.
As of November 16, 2026.
The steps, the checklist, the owner, and the review date are on the page.
This process's health as of November 16, 2026. The score adds the written steps, an approval, a current review, and the latest follow answer.
approved
Quality · approved · Version 2
A skid ships only after a passing pressure test is on the traveler.
Owner Nora Whit. Review 2027-05-12 — Current.
Health 83. Follow answer: partly.
Seats
Quality lead — open on the Talent chart
Team lead — Paolo Doyle
Measure: Test failures.
Priority: Ship a skid that holds.
How we do it here
Test to the procedure for that model.
Write the reading.
A failure stays in the bay.
Close the loop
A failure stays in the bay.
Tell the owner the same day if a step was skipped.
Checklist
The reading is on the traveler. (required)
A failure did not move. (required)
Change history
Version 2 on 2025-05-12, Nora Whit. Clarified who signs, after the May review.
Version 1 on 2024-11-12, Nora Whit. First written from the way the crew already works.
Approval
2024-11-12, Soren Adler: approved. Approved for the crew.
Followed?
2026-09-12, Quality: partly. The main steps were done. One check was skipped.
2026-07-12, Skid line: no. The crew did not follow this on the last round.
2026-05-12, Maintenance: partly. The main steps were done. One check was skipped.
2026-03-12, Fabrication: yes. Done the way it is written.
2026-01-12, Shipping: yes. Done the way it is written.
2025-11-12, Quality: yes. Done the way it is written.
2025-09-12, Skid line: yes. Done the way it is written.
2025-07-12, Maintenance: partly. The main steps were done. One check was skipped.
2025-05-12, Fabrication: no. The crew did not follow this on the last round.
2025-03-12, Shipping: partly. The main steps were done. One check was skipped.
2025-01-12, Quality: yes. Done the way it is written.
Process Library
This page is part of the operating rhythm. The phone bar is the same on every screen.
1 of 3
Add to home screen
On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.
Speak, then edit the words before you save.
This uses the microphone in your browser. We ask only when you press Speak. The audio is not uploaded and not stored. Only the text you keep is saved with the form.
Confirm?
Shortcut: Alt+M while you are in a field. Press-to-talk stops when you release M.