Help
How to use PGOS
Download

Latest year in this book.

Product Management Book
You
Theme
Light or dark
Language Sign in
Sample: Comfort Pro Heating & Air

Sample company: Comfort Pro Heating & Air. These aren't your numbers. See an example: Manufacturer

Other examples

Distributor Regional distributor Coaching

This book · ideas waiting on a gate

16 ?

Open is an idea that is not shipped, parked, or stopped. The next step is the idea furthest along a gate.

Open this decision ?

Next decision: Pipe repair, after-launch review is at After-launch review. Open it and record the decision.

Product Management

The margin on a product already in the file stays on Simplify. A launch dollar is a new product you name. Each gate buys a small piece of information before the next one is funded.

7 product lines from the file. Their margin stays on Simplify. A new product is a separate launch.

SKUs and families to review ?

Each card is one SKU or one product family. The few that make the profit stay. A weak SKU is the one to stop or reprice. The dollar is already on the file. Accept records the line. It does not change the book, and nothing is emailed.

These are what we believe based on the data you gave us. Verify each line. You decide.

Suggestions. Nothing here is posted until you accept a line.
What to look at Suggested action Dollar Why Source rows Decide
Core line Review Core line before the individual products $228,258.53 Core line adds the named products. The dollar is those product lines. Accepting this line does not post it. Maintenance plan
Core line · Maintenance plan Keep Maintenance plan $228,258.53 Maintenance plan has a margin on the file. The dollar is that margin. Accepting this line does not post it. Maintenance plan
Catalog tail Review Catalog tail before the individual products $8,382.72 Catalog tail adds the named products. The dollar is those product lines. Accepting this line does not post it.
5 source rows

Callback visit, Thermostat install, System replacement, Small one-off job, Duct cleaning

Catalog tail · System replacement End System replacement $1,988.76 System replacement has a margin on the file. The dollar is that margin. Accepting this line does not post it. System replacement
Catalog tail · Duct cleaning End Duct cleaning $1,918.42 Duct cleaning has a margin on the file. The dollar is that margin. Accepting this line does not post it. Duct cleaning
Catalog tail · Thermostat install End Thermostat install $1,730.17 Thermostat install has a margin on the file. The dollar is that margin. Accepting this line does not post it. Thermostat install
Catalog tail · Small one-off job End Small one-off job $1,436.15 Small one-off job is below zero on the file. The dollar is that loss. Accepting this line does not post it. Small one-off job
Catalog tail · Callback visit End Callback visit $1,309.22 Callback visit is below zero on the file. The dollar is that loss. Accepting this line does not post it. Callback visit
Show the rest (10)
The rest of the suggestions. Nothing here is posted until you accept a line.
What to look at Suggested action Dollar Why Source rows Decide
Renewal Review Renewal before the individual products $269.76 Renewal adds the named products. The dollar is those product lines. Accepting this line does not post it. Renewal kit
Renewal · Renewal kit End Renewal kit $269.76 Renewal kit has a margin on the file. The dollar is that margin. Accepting this line does not post it. Renewal kit
Catalog tail · After-hours emergency call End After-hours emergency call Not in the file No margin is named on After-hours emergency call. After-hours emergency call
Catalog tail · Diagnostic only End Diagnostic only Not in the file No margin is named on Diagnostic only. Diagnostic only
Catalog tail · Drain cleaning End Drain cleaning Not in the file No margin is named on Drain cleaning. Drain cleaning
Catalog tail · Light commercial rooftop service End Light commercial rooftop service Not in the file No margin is named on Light commercial rooftop service. Light commercial rooftop service
Catalog tail · Pipe repair End Pipe repair Not in the file No margin is named on Pipe repair. Pipe repair
Catalog tail · Water heater replacement End Water heater replacement Not in the file No margin is named on Water heater replacement. Water heater replacement
Core line · AC repair Keep AC repair Not in the file No margin is named on AC repair. AC repair
Core line · Furnace repair Keep Furnace repair Not in the file No margin is named on Furnace repair. Furnace repair

Not started Planned Not yet sized. Actual Not recorded. Variance Not recorded.

? Product line. Planned Not yet sized. Actual Not recorded. Variance Not recorded. Ship 0. Kill 6. Existing product margin stays on Simplify. Jan 15–Dec 15, 2025. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

Plan is an approved launch dollar on a new product. Existing product margin is not added. Simplify, Pricing, and Sales are not added. A blank actual stays unrecorded.

In motion now

This book · the counts on the file · not a week or a month ?

  • On track Product lines with a known margin. Now 7. From the file.
  • Watch Launches not yet at the gate. Now 7. A stage on each one.

Dollars after the decision

?

  • Not started Approved launch dollars. Now Not yet sized. New products only.
  • Not started Recorded after launch. Now Not recorded. The later dollar.

In motion is a count on this book, not a dollar. A line with a known margin is counted. A launch that has not reached its gate is counted. Dollars after the decision are the approved launch dollar and the later recorded dollar. A blank stays unrecorded. Nothing here posts until you approve.

Which product holds the sales

This year. Each bar is sales for one product. A blank stays off. A loss stays off. A known zero stays on. The longest bar holds the most. Nothing here posts.Maintenance plan$865.4KDuct cleaning$11.1KSmall one-off job$11.0KSystem replacement$10.8KThermostat install$10.7KCallback visit$9.9KRenewal kit$813
  1. Maintenance plan · $865.4K
  2. Duct cleaning · $11.1K
  3. Small one-off job · $11.0K
  4. System replacement · $10.8K
  5. Thermostat install · $10.7K
  6. Callback visit · $9.9K
  7. Renewal kit · $813
This year. Each bar is sales for one product. A blank stays off. A loss stays off. A known zero stays on. The longest bar holds the most. Nothing here posts. ?

? Each bar is the sales already named for that product this year. Margin stays on Simplify. A blank stays off. A loss stays off. A known zero stays on the chart. Two products with the same name stay apart when the family is different. The longest bar holds the most. The chart shows the eight largest. The rest stay on the list. Nothing posts.

Where the line stands

Ship 0. Kill 6. Park 0. Open 16. ?

? This count is product ideas on this book. A bar is counted once for each idea. Ship is accepted and still open. Kill is stopped. Park is set aside. Open is not decided. The window is this book, not a span of weeks.

This book · product ideas by decision · a bar counts one idea · as of Sep 30, 2026

Vitality by year

? Vitality is the share of sales from products launched in the last three years. A year stays off the line when either total is missing. It is not a posted dollar.

Last 3 years. Share of sales from products launched in that window.

One year is on file. The line appears when three years have both.

Gates

? Each bar is how many ideas have reached that gate. An idea is counted again at every earlier gate on its path.

This book. Ideas that have reached each gate.

Which line holds the margin

The months on this file, Jan 15–Dec 15, 2025. Margin by product line. Each bar is one line. A line with no margin stays off. A loss stays off. The longest bar holds the most margin. Nothing here posts.Maintenance plan$228.3KSystem replacement$2.0KDuct cleaning$1.9KThermostat install$1.7KRenewal kit$270
  1. Maintenance plan · $228.3K
  2. System replacement · $2.0K
  3. Duct cleaning · $1.9K
  4. Thermostat install · $1.7K
  5. Renewal kit · $270
The months on this file, Jan 15–Dec 15, 2025. Margin by product line. Each bar is one line. A line with no margin stays off. A loss stays off. The longest bar holds the most margin. Nothing here posts. ?

? Each bar is the margin already named for that product line. The margin stays on Simplify. It is not added here. A blank margin stays off. It is not stored as zero. A loss stays off. A known zero stays on the chart. The longest bar holds the most margin. The chart shows the eight largest. The rest stay on the product list. Nothing posts.

Product lines on the file

  • Renewal kit. Quad Quad 4. Margin $270.
  • Callback visit. Quad Quad 4. Margin −$1.3K.
  • Thermostat install. Quad Quad 4. Margin $1.7K.
  • System replacement. Quad Quad 4. Margin $2.0K.
  • Small one-off job. Quad Quad 4. Margin −$1.4K.
  • Duct cleaning. Quad Quad 4. Margin $1.9K.
  • Maintenance plan. Quad Quad 1. Margin $228.3K.

These margins stay on Simplify. They are not added here.

How to rationalize the line

Complexity cost

Every extra product name costs a quote, a bin, a drawing, and a mistake. The tail of the line looks small in revenue and large in the time it takes from the people who serve the vital few. Count the names. Do not invent a dollar for complexity removed. The margin already sits on Simplify.

Tail sunset checklist

Name the product and the owner. Name the substitute the customer can buy. Record the last order date, then stop taking the order. Run out the inventory you already hold and do not buy more. Tell the accounts that still order it. Write the way back if a named account cannot switch. Sign it. This checklist posts no dollar.

Launch versus kill

Accept an idea only when the customer sentence is clear and a named person will own the next piece of work. Park it when the timing is wrong, and write the date you will look again. Kill it when the evidence says stop, and do not keep spending. A kill and a ship both belong on the status mix so the line does not hide what you stopped.

Which new product holds the launch dollar

The months on this file. Each bar is the launch dollar named for one new product. A blank stays off. A loss stays off. A known zero stays on. The longest bar holds the most. Nothing here posts.Two amounts are needed before this chart can compare them.
The months on this file. Each bar is the launch dollar named for one new product. A blank stays off. A loss stays off. A known zero stays on. The longest bar holds the most. Nothing here posts. ?

? Each bar is the launch dollar named for that new product. It is not a Simplify loss, a Pricing move, or a Sales forecast. A blank stays off. It is not stored as zero. A loss stays off. A known zero stays on the chart. The same product at two stages is two bars. The longest bar holds the most. The chart shows the eight largest. The rest stay on the gate list. Nothing posts until a named person approves it.

New product gate

Watch Next core offer for Comfort Pro Heating & Air

Not on the bridge

Watch Replacement kit the core accounts already buy in pieces

Not on the bridge

Not started Floor price on custom work

Not on the bridge

Not started Dead catalog items pulled from the quote form

Not on the bridge

Not started Second source for the single-source part

Not on the bridge

Not started After-hours or rush fee the book does not name

Not on the bridge

Not started Core-account bundle they already asked for

Not on the bridge

Watch Freight rule for small orders

Not on the bridge

Not started Training offer for the new crew

Not on the bridge

Not started Warranty term on the long-tail item

Not on the bridge

Watch Price book the sellers actually open

Not on the bridge

Watch Stop rule for the offer that missed its test

Not on the bridge

Add a new product

?

Saving keeps the stage and the dollar on this page. A blank dollar is not stored as zero. An existing product cannot be launched again. Nothing is sent.

Owner, dates, and approval

?

Saving names the owner on this page. It does not approve a launch, and nothing is sent.

?

Saving keeps the weekly, monthly, and quarterly dates. Nothing is sent.

?

Approving records the launch dollar for a new product. It does not add margin from a product already on the line. Nothing is sent.

?

Signing records who read this page. It does not add a dollar, and nothing is sent.

Receipts

  • 2026-10-22T15:00:00+00:00 · Ray Delgado · Killed an idea that missed its test. No dollar was added.
  • 2026-09-18T15:00:00+00:00 · Ray Delgado · Recorded an ending. No dollar was added.

The Product Management lesson from Bill is coming. The written guide on this page is the operating method until that recording is in the lesson library.

Lessons

  • Product Management: fund in stages, and run a launch the customer can succeed with

    Text lesson

    Fund a product in stages, then launch it so the customer can succeed.

    Lesson ?

    This opens the lesson for this screen. Nothing is saved, and nothing is emailed.

  • Worth Every Cent, Ch. 1 Busy Is Not a Business

    Book chapter

    Busy is not the same as a business.

    Book ?

  • Worth Every Cent, Ch. 7 Fund the Critical Few

    Book chapter

    Fund the few products that matter.

    Book ?

  • Worth Every Cent, Ch. 8 Test Before You Fund

    Book chapter

    Test before you fund the next stage.

    Book ?

  • Worth Every Cent, Ch. 13 Launch So Customers Succeed

    Book chapter

    Launch so the customer gets a useful result.

    Book ?

  • Worth Every Cent, Ch. 14 Measure What Happens After the Sale

    Book chapter

    Measure what happens after the sale.

    Book ?

  • Worth Every Cent, Ch. 18 Run the Product Review

    Book chapter

    Run a product review on a set rhythm.

    Book ?

  • Product Innovation, Diversification Analysis

    Text lesson

    How far new products and new lines have actually gone.

    Watch ?

Written lesson

Fund in stages: the sequence in plain words

Pay for the next step only. A full build before a customer has used the offer is how money disappears.

Worth Every Cent

Written lesson

Decide before the result: write the stop rule first

Write the stop rule before the work starts. If the test misses it, stop. Do not rename the miss as a success.

Worth Every Cent

Written lesson

First useful result: when a launch counts as done

A launch is done when a customer gets a useful result, not when the slide is pretty.

Worth Every Cent

Written lesson

The vitality score and the monthly product review

New products have to earn a share of sales. Review that share every month. A dead item stays on the quote form until someone takes it off.

Worth Every Cent

The line and the gates

Back Next

Product idea

Start with one sentence about the customer. Then choose the full path or the faster path. Gates 3 and 4 are not on the faster path.

Pipe repair, after-launch review

Quinlan Grain House 07 asked whether Pipe repair still belongs on the line.

Full path. Current gate: After-launch review. Recommender: Ray Delgado. Decides: Ray Delgado.

Accept it and it ships. Park it when the timing is wrong. Kill it and stop spending. None of these posts a dollar.

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

Open Profit Bridge

Open the offer in Quad 4 ?

The catalog is the offers you keep, fix, or stop.

Product Management

This is the product line. Margin, vitality, and the work that should stop.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.