Help
How to use PGOS
Download

Latest year in this book.

Marketing Measures Book
You
Theme
Light or dark
Language Sign in
Sample: Comfort Pro Heating & Air

Sample company: Comfort Pro Heating & Air. These aren't your numbers. See an example: Manufacturer

Other examples

Distributor Regional distributor Coaching

Right to Grow

2.25 ?

Earn the Right to Grow. The ratio is 2.25. Same quarter last year 2.10. Direction Rising. Trailing twelve months. The quarter rows are the same file. A blank target is not zero. Posting a target does not add the dollars a second time. Jan 15–Dec 15, 2025. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

Simplify first

Open the board view?

This opens the board view. Nothing is saved, and nothing is sent.

Marketing measures

Earn the Right to Grow

Trailing twelve months. Material margin over fully loaded people cost.

Jan 15–Dec 15, 2025 · trailing twelve months · material margin over people cost

First line 2.5. The first line on this page is 2.5. For industrial distribution, the lesson's line is 2.5. Below the industrial distribution line of 2.5. Growth is not earned yet.

Same quarter last year 2.10. Direction Rising.

  • Direct labor sits in cost of goods, so it was left out of the numerator.
  • Rebates and discounts booked below gross margin were put back into the numerator.

Sixteen quarters

16 quarters on the chart, 2022 Q4 through 2026 Q3. The yellow line is 2.5. The navy line is 2.0.

2022 Q4 through 2026 Q3 · Right to Grow by quarter · as of 2026 Q3

2022 Q4 1.62 2023 Q1 1.70 2023 Q2 1.76 2023 Q3 1.84 2023 Q4 1.91 2024 Q1 1.88 2024 Q2 1.96 2024 Q3 2.04 2024 Q4 2.11 2025 Q1 2.16 2025 Q2 2.08 2025 Q3 2.10 2025 Q4 2.25 2026 Q1 2.25 2026 Q2 2.25 2026 Q3 2.25
QuarterRatioMaterial marginPeople cost
2022 Q41.6211340000.07000000.0
2023 Q11.7011900000.07000000.0
2023 Q21.7612320000.07000000.0
2023 Q31.8412880000.07000000.0
2023 Q41.9113370000.07000000.0
2024 Q11.8813160000.07000000.0
2024 Q21.9613720000.07000000.0
2024 Q32.0414280000.07000000.0
2024 Q42.1114770000.07000000.0
2025 Q12.1615120000.07000000.0
2025 Q22.0814560000.07000000.0
2025 Q32.1014700000.07000000.0
2025 Q42.2515749999.9999999986999999.99
2026 Q12.2515749999.9999999986999999.99
2026 Q22.2515749999.9999999986999999.99
2026 Q32.2515749999.9999999987000000.03

What moved it

From 2025 Q3 at 2.10 to 2026 Q3 at 2.25. People cost is the denominator on its own. The rest is the margin move, split for the review. Change the split if the controller disagrees.

Start · 2.10

Price · +0.11 $741K

Mix · +0.07 $494K

Cost to serve · -0.01 −$99K

Complexity · -0.01 −$86K

People cost · 0.00 $0

The case

The worked path. Ratio 2.42. EBITDA moves by $4.7 million when every other cost holds. Contribution after people cost $39.7 million.

Tail product margin 12 percent. Tail customer margin 15 percent. Quad 1 margin 41 percent. Replace these when the segment P&L is in.

A 180 million dollar business at 2.25. One and a half points of price is 2.7 million. Material margin moves from 63 to 65.7. The ratio moves from 2.25 to 2.35.

Cut 10 percent of the people and the margin they were producing goes with them. 63 becomes 56.7. People cost becomes 25.2. The ratio is still 2.25. The work has to leave before the people do.

The track

Suggested from the ratio. The leadership team can change it. The track now is Simplify first.

Direction matters more than the band. A company climbing through the line is a better bet than a company sliding inside it.

The other track

Fix first · where the band puts this file

Enter when the ratio is below 2.5, or the direction is falling.

Exit when the ratio has held at or above 2.5 for two quarters and the direction is not falling.

Do not fund added sales capacity. Spend the money on price, mix, and complexity.

Grow

Enter when the ratio is at or above 2.5 and the direction is flat or rising.

Exit when the ratio falls below 2.5, or it gives back two tenths in a year.

Fund the growth plan. The engine converts a new dollar into profit.

Bands ?

This count is the lesson's industry lines. A line is counted when the lesson names a healthy range for that kind of company. These are the Institute's lines, not a survey of other companies. Source: The 80/20 Institute, as of November 22, 2026.

  • Industrial distribution. Below 2.5 the engine has not earned growth. 2.5 to 3.5 is the healthy band. 4.0 is exceptional. Below the industrial distribution line of 2.5. Growth is not earned yet.
  • Manufacturer. A plant with few people and a lot of machinery runs a little higher, because the machines sit in the numerator. Below the manufacturer line of 2.5. Growth is not earned yet.
  • Service and engineering. When the product is people, 2.2 can be healthy. Calibrate the line to the work. At or above the service and engineering line of 2.0.

What moves it

  1. Price. Price first. Two to four points of realized price moves the ratio about 0.1 to 0.3 within two quarters. On this file, 2 points is $3.6 million and the ratio goes to 2.38. 4 points is $7.2 million and the ratio goes to 2.51.
  2. Mix and complexity. Then mix and complexity. Keep the work that earns, and take out the work that does not. Quad 4 is the first place to simplify when its ratio is 0.96.
  3. Headcount. A headcount cut does not move the ratio unless the work went away first. If the work is still here, the cost comes back.

By quad

A customers and B customers, against A products and B products.

QuadRatioMaterial marginPeople cost
Quad 1 2.86 40000000.0 13999999.999999998
Quad 2 1.93 12000000.0 6222222.222222221
Quad 3 1.71 8000000.0 4666666.666666666
Quad 4 0.96 3000000.0 3111111.1111111105

People cost shared by sales.

Customers in Quad 1

CustomerProductQuadRevenueMarginRatio
Northwick Mill Bearing kit Quad 1 $42 million $18.9 million 2.89
Harbor Shed Bearing kit Quad 1 $28 million $12.6 million 2.89
Pellam Civic Valve set Quad 1 $20 million $8.5 million 2.73

People cost on a customer line is the company people cost shared by sales.

Products

  • Bearing kit · $70 million · margin 45% · Quad 1
  • Custom gasket · $22 million · margin 30% · Quad 2
  • Valve set · $20 million · margin 42% · Quad 1
  • Spare motor · $18 million · margin 30% · Quad 2
  • Standard seal · $16 million · margin 28% · Quad 3
  • Wear plate · $14 million · margin 26% · Quad 3
  • Custom hose · $11 million · margin 14% · Quad 4
  • Special fastener · $9 million · margin 17% · Quad 4

Data check

caught

Labor in both lines

Direct labor sits in cost of goods and in people cost. It was taken out of the numerator, so it is counted once.

caught

Rebates below gross margin

Rebates and discounts booked below gross margin were put back into the numerator. That is price, not a program.

watch

Contractor cost

Consultants and contractors of $1.4 million sit outside people cost. If they do the work of an employee, they belong in the denominator. Putting them there, with owner pay brought up to a market $280K, moves the ratio from 2.25 to 2.14.

watch

Owner pay

Owner pay on this file is $180K. A market salary for the seat is $280K. The market figure is the team's assumption, not a line from the P&L. A light owner salary makes the ratio look better than the work costs.

clear

Intercompany

No intercompany sales are on this file. If one unit sells to another, take the transfer price out and use the outside cost.

Lessons and chapters

  • Lesson Earn the Right to Grow: the two-line ratio. Two lines, the traps, the bands, and the two tracks.
  • Lesson Right to Grow assessment. How to sit with the controller and write the number.
  • Book chapter Earn the right to grow. Material margin over fully loaded people cost. The first line in the chapter is 2.0.
  • Book chapter Where the profit actually lives. A customers and B customers, against A products and B products.
  • Book chapter Price, then mix. Two to four points of realized price, then retire the tail and redeploy the capacity.

The coach

The trailing twelve months read 2.25. The same quarter last year was 2.10, so the direction is rising. For an industrial distributor, 2.5 is the line where growth is earned. Price on this case is $2.7 million. The mix move is $2 million. The ratio on that case is 2.42. EBITDA moves by $4.7 million if every other cost holds. A headcount cut does not get you there unless the work left first. Contractors and a light owner salary still sit outside the denominator, so read the stated ratio with that in mind.

Offline. This is not a live AI answer. Demo mode. Sample company. These aren't your numbers. This is not a live model. This public sample does not call a live model. Answers are assembled from Bill's sample material. Client data is not used to train models.

Customer themes on the file: Price on the core line, Spare-parts complexity, Delivery on the kit. 2 detractor follow-ups are still open. A theme becomes a candidate for the 90-day plan when the team accepts it.

On the Profit Bridge

These are targets. A blank is not zero. Posting them does not add the dollars a second time.

  • Realized price on the core line. $2.7 million on Pricing. One and a half points. It drops to the margin and to EBITDA.
  • Move tail revenue into Quad 1. $2 million on Simplify. Retire the tail at 12 percent margin and redeploy the same dollars at 41 percent.
  • Cost to serve on the tail. Not sized on Cost. Not sized. It needs a segment P&L with cost to serve. A blank is not zero.
  • Complexity on the custom hose. Not sized on Simplify. The capacity it frees is already in the mix move. It is not added again.
  • People cost after the work leaves. $0 on People. Zero until the work is gone. A cut that leaves the work in place does not move the ratio.

Open the Profit Bridge · Open the board view · Download the one-page board

Voice of the customer

Interviews, survey comments, and call notes. A quote stays the customer's words. A theme the team accepts becomes a candidate on the 90-day plan.

The connector is off. Paste a transcript, a CSV, an email, or CRM notes. Nothing is pulled.

Interview guides

Buyer · User · Lost customer · Churned customer · Distributor

Buyer

  1. What do you buy from us, and what do you buy from someone else?
  2. When did the price last feel fair, and when did it not?
  3. Which quote took too long?
  4. What would you drop from the order without missing it?
  5. Who else has to say yes?
  6. What would make you send the next order without a bid?

User

  1. What job are you trying to get done when you call us?
  2. Where does the product slow the job down?
  3. What do you keep on the shelf, and what do you wait for?
  4. When it fails, who gets the call?
  5. What would you tell the buyer to change?
  6. What do you wish we stopped making?

Lost customer

  1. What did you ask us to quote?
  2. Where did we fall out?
  3. Was it price, the spec, or the time to answer?
  4. Who got the order, and what did they offer that we did not?
  5. Would a different price have changed it?
  6. What should we stop quoting?

Churned customer

  1. When did the orders slow down?
  2. What changed on your side, and what changed on ours?
  3. Was there a last straw?
  4. Did anyone from our side call before you left?
  5. What would have to be true for you to come back?
  6. Who should we have told?

Distributor

  1. Which of our lines turn, and which sit?
  2. Where do we make you carry too many SKUs?
  3. What do your customers complain about that lands on you?
  4. Where is our price out of line with the line you can actually sell?
  5. What do you need from us in the branch that you do not get?
  6. Which SKU should come out of the book?

What they said

Interview · 2026-09-12

Comfort Pro Heating & Air sat with the buyer at Northwick Mill. The bearing kit price is fine. They will not pay a premium for a gasket they can buy anywhere.

Northwick Mill · Bearing kit · Quad 1

Call note · 2026-09-18

Call note. Three quotes, one decision maker, and a request to drop the custom hose. The work consumes the counter and does not earn.

Calder Pump House · Custom hose · Quad 4

Survey comment · 2026-10-02

Survey comment. Delivery on the bearing kit is why they stay. The spare-parts catalog is the part they complain about.

Harbor Shed · Bearing kit · Quad 1

Theme read

Grouped from the notes on this file. Frequency times the revenue of the customers who said it, times the quad. Quotes are verbatim.

Spare-parts complexity · negative · 2 mentions · $39 million · Quad 1 · weight 78.0

“Call note. Three quotes, one decision maker, and a request to drop the custom hose. The work consumes the counter and does not earn.”

Call note, Calder Pump House · 2026-09-18 · negative

“Survey comment. Delivery on the bearing kit is why they stay. The spare-parts catalog is the part they complain about.”

Survey comment, Harbor Shed · 2026-10-02 · mixed

Price. Do not discount the custom hose to keep it. The price will not fix the work.

Product decision. Product decision: stop quoting the custom hose.

Plan. Move the tail into Quad 1.

Price on the core line · mixed · 1 mentions · $42 million · Quad 1 · weight 42.0

“Comfort Pro Heating & Air sat with the buyer at Northwick Mill. The bearing kit price is fine. They will not pay a premium for a gasket they can buy anywhere.”

Interview, Northwick Mill · 2026-09-12 · mixed

Price. Hold the bearing-kit price. One and a half points is the worked path, not a new list price on the gasket.

Product decision. No new-product decision on the kit. The gasket does not earn a premium.

Plan. Realized price on the core line.

Delivery on the kit · mixed · 1 mentions · $28 million · Quad 1 · weight 28.0

“Survey comment. Delivery on the bearing kit is why they stay. The spare-parts catalog is the part they complain about.”

Survey comment, Harbor Shed · 2026-10-02 · mixed

Price. Delivery is why the kit holds its price. Do not trade it for a discount.

Product decision. Keep the kit. Do not add a slower line beside it.

Plan. Protect delivery on the kit.

Themes on the plan

Price on the core line · Northwick Mill, Bearing kit, Quad 1

Spare-parts complexity · Calder Pump House, Custom hose, Quad 4

Delivery on the kit · Harbor Shed, Bearing kit, Quad 1

Win and loss

won · reorder · 2026-10-02

Harbor Shed · Bearing kit · Quad 1 · $28 million

They stayed for delivery. The spare-parts catalog is the complaint, and it did not lose the order.

lost · leave · 2026-09-28

Fenwick Foundry · Special fastener · Quad 4 · $9 million

They waited on the special fastener, then bought elsewhere. Price was not the line they cited.

lost · quote · 2026-09-18

Calder Pump House · Custom hose · Quad 4 · $11 million

Three quotes, one decision maker, and a request to drop the custom hose. The work consumes the counter.

The loop

Heard, then decided, then acted, then told the customer.

Heard

Harbor Shed · Spare-parts complexity

Heard it in the survey comment. The catalog is the complaint.

Decided

Northwick Mill · Price on the core line

Decided to hold the bearing-kit price. No premium on the gasket.

Acted

Calder Pump House · Spare-parts complexity

Stopped quoting the custom hose. The counter is back on the kit.

Told the customer

Northwick Mill · Delivery on the kit

Told the buyer the delivery promise stays, and the price holds.

Bring notes in

NPS

A score from 0 to 10. 9 and 10 promote. 7 and 8 are passive. 0 through 6 need a call back. Relationship and this-order scores stay separate. CSAT is 1 to 5. Ease is 1 to 7, and 7 is easy.

Relationship

3 ?

This is the relationship score, from -100 to 100. It is promoters minus detractors, as a share of those scores.

11 promoters · 15 passives · 10 detractors · 36 scores.

Response rate 82% of 44 sent ?. Margin of error ±25 ?.

This is the share of relationship surveys that came back, out of the ones sent.

This is the margin of error on the relationship score, in score points.

CSAT 3.6 ?. Ease 4.8 ?.

This is the average satisfaction score for the relationship, from 1 to 5.

This is the average ease score for the relationship, from 1 to 7. 7 is easy.

From 2025 Q4 at 11 to 2026 Q3 at 11, the move is +0. That is inside the noise.

Open the relationship survey

This order

-17 ?

This is the score for this order, from -100 to 100. It stays separate from the relationship score.

6 scores. Response rate 75% ?. Margin of error ±72 ?.

This is the share of order surveys that came back, out of the ones sent.

This is the margin of error on the order score, in score points.

CSAT 3.3 ?. Ease 4.2 ?.

This is the average satisfaction score for this order, from 1 to 5.

This is the average ease score for this order, from 1 to 7. 7 is easy.

Two quarters with more than one score are needed before a move can be called real.

Open the order survey

A working band for a book of industrial accounts. Above 50 is a strong book. Below 0, the detractors are running the story. Calibrate it to your own book. Below the industrial distribution band. The promoters are not carrying the detractors. ?

This band is the Institute's working range for that kind of company. It is counted from the lesson, not from a survey of other companies. Source: The 80/20 Institute, as of November 22, 2026.

Scores on the file

0 ?

This is the score on the file, from -100 to 100. It counts every score stored here.

2 promoters · 1 passives · 2 detractors · 5 scores.

NPS by month

Jul 2026 to Sep 2026 · NPS by month · one score per month with answers. A month with no score is left off.

Jul 2026 to Sep 2026 · NPS by month · one score per month with answers. A month with no score is left off.. NPSJul 2026Aug 2026Sep 2026Jul 2026 · NPS · 100.00Aug 2026 · NPS · 50.00Sep 2026 · NPS · -100.00
  1. Jul 2026 · NPS · 100.00
  2. Aug 2026 · NPS · 50.00
  3. Sep 2026 · NPS · -100.00
Jul 2026 to Sep 2026 · NPS by month · one score per month with answers. A month with no score is left off. ?

? NPS is promoters minus detractors for that month, from -100 to 100. A month with no score stays off the line. It is not a posted dollar.

Relationship NPS by quarter

2025 Q4 to 2026 Q3 · relationship NPS · one score per quarter with answers. A quarter with no score is left off.

2025 Q4 to 2026 Q3 · relationship NPS · one score per quarter with answers. A quarter with no score is left off.. Relationship NPS (relationship NPS)2025 Q42026 Q12026 Q22026 Q32025 Q4 · Relationship NPS · 11.102026 Q1 · Relationship NPS · 0.002026 Q2 · Relationship NPS · -11.102026 Q3 · Relationship NPS · 11.10
  1. 2025 Q4 · Relationship NPS · 11.10
  2. 2026 Q1 · Relationship NPS · 0.00
  3. 2026 Q2 · Relationship NPS · -11.10
  4. 2026 Q3 · Relationship NPS · 11.10
2025 Q4 to 2026 Q3 · relationship NPS · one score per quarter with answers. A quarter with no score is left off. ?

? Relationship NPS is the score for that quarter. A quarter with no score stays off the line. It is not the order survey.

QuarterNPSScores
2025 Q411.19
2026 Q10.09
2026 Q2-11.19
2026 Q311.19

By quad, on the file

  • Quad 1 · 100.0 · 2
  • Quad 2 · 0.0 · 1
  • Quad 4 · -100.0 · 2

What the score follows

Promoters on the book carry $88 million. Detractors carry $20 million. Accounts still buying score 32. Accounts leaving score -100.

  • Quad 1 · 75 · 12 scores
  • Quad 2 · 25 · 8 scores
  • Quad 3 · -25 · 8 scores
  • Quad 4 · -100 · 8 scores

Account health

NPS, margin, growth, and the quad. The low scores are listed first.

AccountQuadLatestMarginGrowthHealth
Fenwick Foundry Quad 4 3 17% -11% 26 · Off track
Calder Pump House Quad 4 5 14% -8% 31 · Off track
Lowry Heat Treat Quad 3 7 26% 0% 56 · Watch
Dock Street Marine Quad 3 8 28% -2% 59 · Watch
Ashford Rail Quad 2 8 30% 1% 69 · Watch
Millrace Electric Quad 2 9 30% 3% 74 · Watch
Pellam Civic Quad 1 8 42% 2% 83 · Strong
Harbor Shed Quad 1 9 45% 4% 88 · Strong
Northwick Mill Quad 1 9 45% 6% 90 · Strong

The survey link

/pgos/demo/marketing-measures?survey=score

Email stays off until it is turned on for this company. The link works either way. Nothing is sent from this page.

Import scores

Close the loop

  • Call Calder Pump House. The custom hose is the complaint. Tell them what we decided.

    Calder Pump House · score 5 · Priya Shah · due 2026-11-20 · open

  • Evan called Fenwick Foundry. They already bought elsewhere. The close is to tell them we heard it.

    Fenwick Foundry · score 3 · Evan Brooks · due 2026-11-18 · called

  • Call Calder Pump House. The custom hose is the complaint. · open
  • Call Fenwick Foundry this week. They already bought elsewhere. · open
Open the 90-day plan ?

If you are unsure, open the 90-day plan and do the first open item.

Market Measures

This page is part of the operating rhythm. The phone bar is the same on every screen.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.