Help
How to use PGOS
Download

Latest year in this book.

Profit Bridge Book
You
Theme
Light or dark
Language Sign in
Sample: Larkspur Precision

Sample company: Larkspur Precision. These aren't your numbers. See an example: Distributor

Other examples

Regional distributor HVAC and plumbing Coaching

Import data

Profit Bridge

Cash this quarter

Cash change $150,546 this quarter. This is cash, not the profit walk. ?

Cash change $150,546 ?

Profit $257,400 ?

Cash rose in this window. A profitable period can still drain the bank in another window.

Money customers owe you absorbed cash this period.

Operating profit: earnings before interest and tax, after depreciation. The Profit Bridge starts at EBITDA, which is this profit plus depreciation.

Open the full cash bridge

Sized plan $491K. Counted once from sourced lines. The line total matches.

Lever

All levers

Watch Pricing. Plan $122.7K. Actual Not recorded. Attained Unknown.

Area: price (revenue). This dollar is revenue, not an EBITDA effect. It is not in the total.

A price move. The assumption says the increase sticks and cost holds. The dollar is a price effect on revenue. It is not in the EBITDA total.

Source pricing_desk.moves.

Products on the sized moves: Adapter plate, Bearing cap, Bearing cap 02, Bracket kit, Bushing set, Custom one-off job, Gear blank, Gear blank 02, Impeller blank, Machined flange, Machined flange 02, Manifold block, Manifold block 02, Price book, Prototype part, Pump housing, Pump housing 02, Renewal kit, Rush repair part, Shaft assembly, Shaft assembly 02, Small-batch fitting, Valve body, Valve body 02, Weldment frame, Weldment frame 02. Planned dollars are the sum of sized price moves. Each move assumes the increase sticks and cost holds. This amount is counted once. The assessment model's pricing figure is not added.

Start Not set. Ramp Not set months. Cost to achieve Not set.

Haircut Not set. A haircut is a scenario. It does not change the plan.

Miss note: Not set.

Named items

NamePlanAssumption
Price book18600.0The increase sticks and cost holds.
Pump housing3612.0The increase sticks and cost holds.
Valve body3864.0The increase sticks and cost holds.
Shaft assembly4116.0The increase sticks and cost holds.
Machined flange4368.0The increase sticks and cost holds.
Gear blank3360.0The increase sticks and cost holds.
Bearing cap3612.0The increase sticks and cost holds.
Weldment frame3864.0The increase sticks and cost holds.
Manifold block4116.0The increase sticks and cost holds.
Bushing set4368.0The increase sticks and cost holds.
Impeller blank3360.0The increase sticks and cost holds.
Adapter plate3612.0The increase sticks and cost holds.
Bracket kit3864.0The increase sticks and cost holds.
Prototype part4116.0The increase sticks and cost holds.
Custom one-off job4368.0The increase sticks and cost holds.
Rush repair part3360.0The increase sticks and cost holds.
Small-batch fitting3612.0The increase sticks and cost holds.
Pump housing 023864.0The increase sticks and cost holds.
Valve body 024116.0The increase sticks and cost holds.
Shaft assembly 024368.0The increase sticks and cost holds.
Machined flange 023360.0The increase sticks and cost holds.
Gear blank 023612.0The increase sticks and cost holds.
Bearing cap 023864.0The increase sticks and cost holds.
Weldment frame 024116.0The increase sticks and cost holds.
Manifold block 024368.0The increase sticks and cost holds.
Renewal kit3360.0The increase sticks and cost holds.
Pump housing3612.0The increase sticks and cost holds.
Valve body3864.0The increase sticks and cost holds.

Open the module

Approved lessons

Written lesson

One dollar, one line

Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.

The EBITDA Bridge

Name the largest step ?

The bridge is the walk from this year's profit to the profit you want.

Profit Bridge

This is the walk from this year's profit to the profit you are aiming at.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.