Help
How to use PGOS
Download

Latest year in this book.

Profit Bridge Book
You
Theme
Light or dark
Language Sign in
Sample: Larkspur Precision

Sample company: Larkspur Precision. These aren't your numbers. See an example: Distributor

Other examples

Regional distributor HVAC and plumbing Coaching

Import data

Profit Bridge

Cash this quarter

Cash change $150,546 this quarter. This is cash, not the profit walk. ?

Cash change $150,546 ?

Profit $257,400 ?

Cash rose in this window. A profitable period can still drain the bank in another window.

Money customers owe you absorbed cash this period.

Operating profit: earnings before interest and tax, after depreciation. The Profit Bridge starts at EBITDA, which is this profit plus depreciation.

Open the full cash bridge

Sized plan $491K. Counted once from sourced lines. The line total matches.

Left out and refused

These dollars stepped aside. They are not in the plan. Total left out $4,100. This is not added and not subtracted.

Which item that stepped aside holds the dollar

This year. Each bar is a dollar that stepped aside. A blank stays off. A loss stays off. A known zero stays on. The longest bar holds the most. Nothing here is added or subtracted.pricing · Gear blank 0$3,300pricing · Marlow Glass$400simplify · Weldon Faci$400
  1. pricing · Gear blank 02 · $3,300
  2. pricing · Marlow Glass Works 40 · $400
  3. simplify · Weldon Facilities 31 · $400
This year. Each bar is a dollar that stepped aside. A blank stays off. A loss stays off. A known zero stays on. The longest bar holds the most. Nothing here is added or subtracted. ?

? Each bar is a dollar that stepped aside and is not in the plan. It is not added and not subtracted. A blank stays off. It is not stored as zero. A loss stays off. A known zero stays on the chart. Two amounts for the same item are one bar. The longest bar holds the most. The chart shows the eight largest. The rest stay on the list.

NameDollarWhy it stepped asideHeld by
Ostler Packing Hall 33Not setReprice is counted on Pricing, not here.pricing
Weldon Facilities 31399.91Kept. No savings dollar.simplify
Marlow Glass Works 40399.91Reprice is counted on Pricing, not here.pricing
Renewal kitNot setAlready on the Pricing line. Not added again.pricing
Bracket kitNot setKept. No savings dollar.simplify
Rush repair partNot setAlready on the Pricing line. Not added again.pricing
Valve body 02Not setReprice is counted on Pricing, not here.pricing
Gear blank 023300.17Already on the Pricing line. Not added again.pricing
Bushing setNot setKept. No savings dollar.simplify
Pump housingNot setReprice is counted on Pricing, not here.pricing

Approved lessons

Written lesson

One dollar, one line

Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.

The EBITDA Bridge

Name the largest step ?

The bridge is the walk from this year's profit to the profit you want.

Profit Bridge

This is the walk from this year's profit to the profit you are aiming at.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.