Help
How to use PGOS
Download

Latest year in this book.

Profit Bridge Book
You
Theme
Light or dark
Language Sign in
Sample: Larkspur Precision

Sample company: Larkspur Precision. These aren't your numbers. See an example: Distributor

Other examples

Regional distributor HVAC and plumbing Coaching

Import data

Profit Bridge

Cash this quarter

Cash change $150,546 this quarter. This is cash, not the profit walk. ?

Cash change $150,546 ?

Profit $257,400 ?

Cash rose in this window. A profitable period can still drain the bank in another window.

Money customers owe you absorbed cash this period.

Operating profit: earnings before interest and tax, after depreciation. The Profit Bridge starts at EBITDA, which is this profit plus depreciation.

Open the full cash bridge

Sized plan $491K. Counted once from sourced lines. The line total matches.

Timing and phasing

Calendar year 2026. In-year Not set. A lever with no start date is left out of the in-year total. The plan total is unchanged.

Which lever holds the in-year dollar

Calendar year 2026. Each bar is the in-year dollar for one lever. A blank stays off. A loss stays off. A known zero stays on. A lever with no start date stays off. The longest bar holds the most. Nothing here posts.Two amounts are needed before this chart can compare them.
Calendar year 2026. Each bar is the in-year dollar for one lever. A blank stays off. A loss stays off. A known zero stays on. A lever with no start date stays off. The longest bar holds the most. Nothing here posts. ?

? Each bar is what that lever contributes in calendar year 2026. A lever with no start date stays off. It is not stored as zero. A blank stays off. A loss stays off. A known zero stays on the chart. Two amounts for the same lever are one bar. The longest bar holds the most. The chart shows the eight largest. The rest stay on the list. The plan total is unchanged.

Not started Timing not set for 12: Pricing, Simplify, Cost Reduction, Strategy Planning, Strategy Execution, Procurement, Sales, Marketing, Lean Operations, Talent, Safety, M&A.

LeverRun-rateIn yearNet of costPaybackQ1Q2Q3Q4

Approved lessons

Written lesson

One dollar, one line

Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.

The EBITDA Bridge

Name the largest step ?

The bridge is the walk from this year's profit to the profit you want.

Profit Bridge

This is the walk from this year's profit to the profit you are aiming at.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.