Written lesson
One dollar, one line
Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.
The Profitable Growth Operating System
Opening this screen.
Cash change -$26,284 this quarter. This is cash, not the profit walk. ?
Cash fell in this window. A profitable period can still drain the bank.
Money customers owe you absorbed cash this period.
Operating profit: earnings before interest and tax, after depreciation. The Profit Bridge starts at EBITDA, which is this profit plus depreciation.
Sized plan $104.1K. Counted once from sourced lines. The line total matches.
On track Procurement. Plan $7,296. Actual $7,296. Attained 100%.
Area: cost of goods. This dollar is an EBITDA effect.
An approved sourcing save inside a known spend.
Source procurement.lines.
Spend lines on the approved saves: Quin Steel Fasteners, Sable Tools, Umber Insurance Desk, Weldon Copper, Zephyr Freight, Cedar Fleet, Plainfield Supplies, Lake Waste, Summit Insurance, Iron Gate Software, West Fork Freight, Maple Parts, Quarry Fleet, Riverbend Subcontract. Each dollar is an approved sourcing save inside a known spend, with an assumption. Cost Reduction cuts are not included. The 25% assessment figure is not included. This amount is counted once on the Procurement line.
Start Not set. Ramp Not set months. Cost to achieve Not set.
Haircut Not set. A haircut is a scenario. It does not change the plan.
Miss note: Not set.
| Name | Plan | Assumption |
|---|---|---|
| Quin Steel Fasteners | 799.5 | The save was measured against the prior invoice on this supplier. |
| Sable Tools | 753.16 | The save was measured against the prior invoice on this supplier. |
| Umber Insurance Desk | 702.94 | The save was measured against the prior invoice on this supplier. |
| Weldon Copper | 656.6 | The save was measured against the prior invoice on this supplier. |
| Zephyr Freight | 606.39 | The save was measured against the prior invoice on this supplier. |
| Cedar Fleet | 556.17 | The save was measured against the prior invoice on this supplier. |
| Plainfield Supplies | 509.83 | The save was measured against the prior invoice on this supplier. |
| Lake Waste | 459.62 | The save was measured against the prior invoice on this supplier. |
| Summit Insurance | 436.44 | The save was measured against the prior invoice on this supplier. |
| Iron Gate Software | 413.27 | The save was measured against the prior invoice on this supplier. |
| West Fork Freight | 386.23 | The save was measured against the prior invoice on this supplier. |
| Maple Parts | 363.06 | The save was measured against the prior invoice on this supplier. |
| Quarry Fleet | 339.88 | The save was measured against the prior invoice on this supplier. |
| Riverbend Subcontract | 312.91 | The save was measured against the prior invoice on this supplier. |
Written lesson
Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.
Help · What's new · Accessibility · Language
This is the walk from this year's profit to the profit you are aiming at.
1 of 3
Speak, then edit the words before you save.
This uses the microphone in your browser. We ask only when you press Speak. The audio is not uploaded and not stored. Only the text you keep is saved with the form.
Confirm?
Shortcut: Alt+M while you are in a field. Press-to-talk stops when you release M.