Profit Bridge

Cash this quarter

Cash change $150,546 this quarter. This is cash, not the profit walk. ?

Cash change $150,546 ?

Profit $257,400 ?

Cash rose in this window. A profitable period can still drain the bank in another window.

Money customers owe you absorbed cash this period.

Operating profit: earnings before interest and tax, after depreciation. The Profit Bridge starts at EBITDA, which is this profit plus depreciation.

Open the full cash bridge

Sized plan $491K. Counted once from sourced lines. The line total matches.

Lever

All levers

On track Talent. Plan $25.6K. Actual $16.1K. Attained 63%.

Area: people cost. This dollar is an EBITDA effect.

An approved people-cost dollar.

Source talent.seats.

Seats on the named dollars: Technician, Overtime down on the Core line, Same crew, more Core throughput, Contractor spend down. Each legacy dollar is a people cost you named, with an assumption. Each new-path dollar is an approved, measured labor savings or productivity gain. Cost Reduction cuts and Lean savings are not included. The 25% assessment figure is not included. Headcount plans are not included. This amount is counted once on the Talent line.

Start Not set. Ramp Not set months. Cost to achieve Not set.

Haircut Not set. A haircut is a scenario. It does not change the plan.

Miss note: Not set.

Named items

NamePlanAssumption
Technician9411.37A named people cost for this seat, kept on the legacy path.
Overtime down on the Core line5272.95The change was measured on this crew.
Same crew, more Core throughput6484.19The change was measured on this crew.
Contractor spend down4385.75The change was measured on this crew.

Open the module

Approved lessons

Written lesson

One dollar, one line

Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.

The EBITDA Bridge

Name the largest step ?

The bridge is the walk from this year's profit to the profit you want.

Profit Bridge

This is the walk from this year's profit to the profit you are aiming at.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.