Help
How to use PGOS
Download

Latest year in this book.

Profit Bridge Book
You
Theme
Light or dark
Language Sign in
Sample: Keel & Crane Supply

Sample company: Keel & Crane Supply. These aren't your numbers. See an example: Manufacturer

Other examples

Regional distributor HVAC and plumbing Coaching

The Profit Bridge is the walk from this year's profit to the profit you want. Each step is a dollar you can point to.

This year to the plan

$2.5M ?

Sized plan. Baseline $5.5M. Projected EBITDA $8M. This is the profit walk, not cash.

Read the walk?

This moves to the earnings walk on this page. The sized plan does not change, and nothing is sent.

Import data

Profit Bridge

Cash this quarter

Cash change -$870,488 this quarter. This is cash, not the profit walk. ?

Cash change -$870,488 ?

Profit $1,120,022 ?

Cash fell in this window. A profitable period can still drain the bank.

Inventory absorbed cash this period.

Operating profit: earnings before interest and tax, after depreciation. The Profit Bridge starts at EBITDA, which is this profit plus depreciation.

Open the full cash bridge

Each bar is a sourced driver, the way a value-creation bridge works in enterprise planning tools. An empty driver stays empty. Nothing is spread across priorities to fill a gap.

Sized plan $2.5M. Counted once from sourced lines. The line total matches.

The bridge

Move one lever

EBITDA and cash by week 13 update with that move. The plan stays as it is.

Favorable is up. A hatch means the dollar is not signed. The cobalt bar is the largest step. The sign on each label shows whether that step adds or subtracts.

Each line is one step. Not signed means the dollar is not signed.

Plan, plan net of cost to achieve, and actual only choose which dollars a bar uses. Value order and order by size choose the sequence. The window stays this year to the plan.

This year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026

This year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Baseline + EBITDA steps = projected EBITDA. Reconciles to the cent.Goal $7.7MThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Baseline EBITDA $5.5M. On track. Signed.Baseline EB…On track$5.5MThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Pricing $766.8K · Not in the total. Watch. Not signed.PricingWatch$766.8K · Not in the totalThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Simplify $486.8K. Watch. Not signed.SimplifyNot signed$486.8KThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Cost Reduction $248.2K. Watch. Signed.Cost Reduct…Watch$248.2KThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Strategy Planning $1.2M · Not in the total. On track. Not signed.Strategy Pl…On track$1.2M · Not in the totalThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Strategy Execution $1.8M · Not in the total. On track. Not signed.Strategy Ex…On track$1.8M · Not in the totalThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Procurement $1.1M. On track. Signed.100%ProcurementOn track$1.1MThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Sales $117.8K · Not in the total. Watch. Not signed.SalesWatch$117.8K · Not in the totalThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Marketing $117.2K · Not in the total. Watch. Signed.MarketingWatch$117.2K · Not in the totalThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Lean Operations $600K. On track. Signed.77%Lean Operat…On track$600KThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Talent $63.2K. On track. Signed.85%TalentOn track$63.2KThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Safety $80.9K. On track. Signed.86%SafetyOn track$80.9KThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Product Management Not yet sized. Not started. Not signed.Product Man…Not yet sizedThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. M&A $3.8M · Not in the total. On track. Signed.M&AOn track$3.8M · Not in the totalThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. SIOP Not yet sized. Not started. Not signed.SIOPNot yet sizedThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Sized plan $2.5M. Watch. Signed.Sized planWatch$2.5MThis year to the plan · earnings by driver · a bar is one step · as of Sep 30, 2026. Target $7.7M. On track. Signed.TargetOn track$7.7M
  1. This year · earnings · Baseline EBITDA · $5.5M
  2. This year · earnings · Pricing · $766.8K · Not in the total
  3. This year · earnings · Simplify · $486.8K · Not signed
  4. This year · earnings · Cost Reduction · $248.2K
  5. This year · earnings · Strategy Planning · $1.2M · Not in the total
  6. This year · earnings · Strategy Execution · $1.8M · Not in the total
  7. This year · earnings · Procurement · $1.1M
  8. This year · earnings · Sales · $117.8K · Not in the total
  9. This year · earnings · Marketing · $117.2K · Not in the total
  10. This year · earnings · Lean Operations · $600K
  11. This year · earnings · Talent · $63.2K
  12. This year · earnings · Safety · $80.9K
  13. This year · earnings · Product Management · Not yet sized
  14. This year · earnings · M&A · $3.8M · Not in the total
  15. This year · earnings · SIOP · Not yet sized
  16. This year · earnings · Sized plan · $2.5M
  17. This year · earnings · Target · $7.7M

Baseline + EBITDA steps = projected EBITDA. Reconciles to the cent.

Risks

  • Simplify: planned $486.8K, measured Not recorded.
  • Cost Reduction: planned $248.2K, measured Not recorded.

On track Baseline $5.5M. Sized plan $2.5M. Actual $1.6M. Target $7.7M. Gap Ahead $332.1K. ?

Value. Baseline $5.5M. Goal $7.7M. Sized plan $2.5M. Projected EBITDA $8M. Recorded $1.6M. Recorded is what has already posted, and it is not this year's goal. Ahead $332.1K. A blank actual stays blank. Jan 15–Dec 15, 2025. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

Pricing: This dollar is revenue, not an EBITDA effect. It is not in the total.

Sales: This dollar is revenue, not an EBITDA effect. It is not in the total.

Marketing: This dollar is pipeline, not an EBITDA effect. It is not in the total.

Proof

These tiles are not added together. A dollar can sit in more than one.

Named

$2.5M · 6 levers · 33% of the goal

Signed

$2M · 5 levers · 27% of the goal

In flight

None · 0 levers · Unknown

Measured

$1.6M · 4 levers · 21% of the goal

Plan versus actual

This year to the plan. The counts have no week or month. The dollars are the sized plan and the measured actual. ?

On track Planned $2.5M. Actual $1.6M. Variance −$894.8K.

Plan is the sum of sized EBITDA lines. Revenue, pipeline, and lines the module does not call EBITDA stay beside the total. Actual is a measured EBITDA dollar from those same lines. A blank stays blank. The assessment model is not used as either number.

On the plan, and the year
WhenMeasureNowGoal
Not startedOn the planModules not yet sized2Each one sized from its own module, or left blank
Not startedOn the planBridge ownerNot namedOne named owner
Not startedOn the planFollow-through datesNot setWeekly, monthly, and quarterly dates
Not startedOn the planLevers with an owner and a start date0%Every sized lever
Not startedOn the planSigned dollars with a cost to achieve0%A cost on every signed dollar
Not startedOn the planDays to the next reviewNot setThe next saved date
WatchThe yearSized plan$2.5MSum of sourced lines, once
On trackThe yearMeasured actual$1.6MFrom a later measurement, not the model
WatchThe yearAttained65%Measured dollars over the sized plan
On trackThe yearGap to goalAhead $332.1KProjected EBITDA against this year's goal
Not startedThe yearGap explainedUnknownEvery off-track lever has a reason
Not startedThe yearSnapshots kept0One when you sign, and when you ask

On the plan is how many modules are not sized yet, whether a bridge owner is named, and whether the weekly, monthly, and quarterly dates are saved. The year is the sized plan, the sum of those module lines, and the measured actual from a later reading. A blank stays blank. The assessment model is not used. Nothing posts from this table.

Sourced lines

ModulePlanActualSource
Watch Pricing See where $766.8K Not recorded pricing_desk.moves
Watch Simplify $486.8K Not recorded simplify.items
Watch Cost Reduction $248.2K Not recorded cost_reduction.lines
On track Strategy Planning $1.2M $990K smp.annual
On track Strategy Execution $1.8M $1.2M sdp.charters
On track Procurement $1.1M $1.1M procurement.lines
Watch Sales $117.8K Not recorded sales_pipeline.opportunities
Watch Marketing $117.2K Not recorded marketing.channels
On track Lean Operations $600K $460.5K lean_operations.events
On track Talent $63.2K $53.8K talent.seats
On track Safety $80.9K $70K safety.actions
Not started Product Management Not yet sized Not recorded Not yet sized
On track M&A $3.8M $3.8M ma.targets+ma.synergies
Not started SIOP Not yet sized Not recorded Not yet sized

Pricing: Products on the sized moves: Bearing kit 01, Bearing kit 21, Chain reel 10, Contactor 16, Coupling 04, Coupling 24, Drive belt 03, Drive belt 23, Filter element 05, Filter element 25, Fuse block 17, Gasket set 06, Gasket set 26, Hose assembly 08, Impeller 11, Lubricant pail 14, O-ring kit 20, Price book, Pulley 18, Seal pack 02, Seal pack 22, Sensor 15, Shaft sleeve 19, Shim pack 13, Sprocket 09, Valve stem 07, Valve stem 27, Wear ring 12. Planned dollars are the sum of sized price moves. Each move assumes the increase sticks and cost holds. This amount is counted once. The assessment model's pricing figure is not added.

Simplify: Names on the sized losses: Bramble Facilities 61, Hest Glass Works 85, Jasper Grain House 77, Quad 4 cut list. The dollar is the known loss on an exit or a starve. Customer losses are used when any customer is sized. Product losses are the same sales the other way, so they are not added on top. A reprice is not included. A name with a sized price move is not included. This amount is counted once on the Simplify line.

Cost Reduction: Accounts on the named cuts: Overtime premium, Software seats, Warranty, Travel. Each dollar is a cut named on a P&L amount, with an assumption. The 25% assessment figure is not included. Simplify losses and Pricing moves are not included. This amount is counted once on the Cost Reduction line.

Strategy Planning: Quad 1 core: Core accounts buying the core line. The earnings lift from the price floor and the tail exit. It is not the assessment model. This is one annual dollar the company named. Pricing, Simplify, and Cost Reduction are not included. This amount is counted once on the Strategy Planning line.

Strategy Execution: Charters on the named dollars: Reprice the three deepest discounts, Monthly call plan for core accounts, Walk-away rule on one-off quotes, New-account list for the core line, Quote desk standard reply, On-time recovery on the late jobs, Tail-customer exit list, Callback or rework review. Each dollar is named on a charter, with an assumption. The Strategy Planning annual dollar is not included. Pricing, Simplify, and Cost Reduction are not included. This amount is counted once on the Strategy Execution line.

Procurement: Spend lines on the approved saves: Dune Hose and Belt, Farrow Lubricants, Hearth Fasteners, Jute Packaging, Lark Surplus, Cedar Seals, Plainfield Hose, Lake Lubricants, Summit Electrical, Iron Gate Hardware, West Fork Freight, Maple Packaging, Quarry Tools, Riverbend Bearings, Highline Seals, Oak Power transmission. Each dollar is an approved sourcing save inside a known spend, with an assumption. Cost Reduction cuts are not included. The 25% assessment figure is not included. This amount is counted once on the Procurement line.

Sales: Accounts on the forecast: Approved Win 1, Approved Win 2, Approved Win 3, Legacy Commit Co. Each dollar is a new customer or more of an A account's wallet, with an assumption. Coverage of an A account is not included. Pricing, Simplify, and Strategy dollars are not included. This amount is counted once on the Sales line.

Marketing: Channels on the sourced dollars: Inside sales, Account 1, Account 2, Account 3. Each dollar is pipeline the company says this channel sourced, with an assumption. Spend is not the dollar. A blank pipeline cell is not zero. Sales forecast dollars are not included. This amount is counted once on the Marketing line.

Lean Operations: Kaizen events on the named dollars: Improve core pick face 17, Improve core ship lane 18, Improve fast movers 19, Improve bulk rack 22. Each dollar is a finished kaizen, with an assumption. Cost Reduction cuts and Procurement saves are not included. The 25% assessment figure is not included. This amount is counted once on the Lean Operations line.

Talent: Seats on the named dollars: Operator, Overtime down on the Core line, Same crew, more Core throughput, Contractor spend down. Each legacy dollar is a people cost you named, with an assumption. Each new-path dollar is an approved, measured labor savings or productivity gain. Cost Reduction cuts and Lean savings are not included. The 25% assessment figure is not included. Headcount plans are not included. This amount is counted once on the Talent line.

Safety: Actions on the named dollars: Earlier avoided cost on the dock, Lower the claims premium, Lower the clinic invoices, Lower the lost-time cover. Each dollar is an avoided claim or comp cost you named, with an assumption. Cost Reduction cuts and Lean kaizen dollars are not included. The 25% assessment figure is not included. This amount is counted once on the Safety line.

M&A: Targets on the named dollars: Bayside Supply, Measured 2025-11, Measured 2025-12, Measured 2026-01, Measured 2026-02, Measured 2026-03, Measured 2026-04, Measured 2026-05, Measured 2026-06, Measured 2026-07, Measured 2026-08, Measured 2026-09, Measured 2026-10. Each dollar is a synergy you named, with an assumption and a day in the first 100. Cost Reduction, Lean, Procurement, and Safety dollars are not included. The 25% assessment figure is not included. This amount is counted once on the M&A line. Each new dollar is an approved, measured synergy. Talent, Marketing, and Sales dollars are not included on this path. An offer and a multiple are not included. This amount is counted once on the M&A line.

The earnings aim is $7.7M by 2026-01-15. It is not added on this line.

Assessment model, not added

The assessment model is not the sized plan. It is not added to sized module dollars.

Pricing model $698.6K. Overhead model $678.1K. Growth model $873.3K. This year's goal $7.7M. Modeled improvement $2.25M. The three model parts add up to the modeled improvement. Not added to the sized plan.

The Critical Few

A priority does not receive a share of the model. If a price move is linked, the row points at the Pricing line and is not added again.

PriorityPlanActualNote
Raise prices on low-margin small accountsNot yet sizedNot recorded
Serve small accounts at lower costNot yet sizedNot recorded
Sell more top products to top customersNot yet sizedNot recorded
Hold the price floor on core accountsNot yet sizedNot recorded
Visit every core account this quarterNot yet sizedNot recorded
On-time delivery back to the goalNot yet sizedNot recorded
Exit the unprofitable tailNot yet sizedNot recorded
Gross margin holds at the year planNot yet sizedNot recorded
Receivables inside termsNot yet sizedNot recorded
A backup named for each lead seatNot yet sizedNot recorded
Open seats in the largest crewNot yet sizedNot recorded
One new offer for core accountsNot yet sizedNot recorded
Second quote on the top two vendorsNot yet sizedNot recorded
Forecast only deals with a date and a way outNot yet sizedNot recorded
Name the wallet the largest account buys elsewhereNot yet sizedNot recorded
Name the step that sets the promise dateNot yet sizedNot recorded
Hold a weekly look at scrap or callbacksNot yet sizedNot recorded
Close the month by the eighth working dayNot yet sizedNot recorded
Cash and the covenant on the first pageNot yet sizedNot recorded
Finish the quarterly reviews that are still blankNot yet sizedNot recorded
Decide the seat that has stopped growingNot yet sizedNot recorded
Write the stop rule before the next offer is fundedNot yet sizedNot recorded
Take dead items off the quote formNot yet sizedNot recorded
One-page pack signed for the last monthNot yet sizedNot recorded
Red scorecard rows have an ownerNot yet sizedNot recorded
Second source named for the single-source partNot yet sizedNot recorded
Walk away from the quote below the floorNot yet sizedNot recorded

10 dollars stepped aside. They are not in the plan. Left out $741.5K.

Owner, dates, and the signature

Not started Name the bridge owner. Signing does not create a dollar.

Weekly, monthly, quarterly

Not started Set the three dates. Nothing is scheduled until you save them.

Approved lessons

Written lesson

One dollar, one line

Every dollar on the bridge has a line, an owner, and an assumption. If two modules claim it, one of them is wrong.

The EBITDA Bridge

Name the largest step ?

The bridge is the walk from this year's profit to the profit you want.

Profit Bridge

This is the walk from this year's profit to the profit you are aiming at.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.