Sample: Larkspur Precision

Sample company: Larkspur Precision. These aren't your numbers. See an example: Distributor

Other examples

Regional distributor HVAC and plumbing Coaching

Board page

On time and quality

? The same standard as the board pack, for July 2026–September 2026.

Board pack. Earnings are $6,230 behind plan. −$6,230. July 2026–September 2026. File period Jan 15–Dec 15, 2025. The pages in this pack use this quarter. They are not added again. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

On time and first-pass quality, April–September 2026. Goal 95% on time and 98% quality.

Apr to Sep · on time and quality · one point per month. On time (percent), Quality (percent)AprMayJunJulAugSepApr · On time · percent · 91.00May · On time · percent · 92.00Jun · On time · percent · 90.00Jul · On time · percent · 93.00Aug · On time · percent · 94.00Sep · On time · percent · 95.00Apr · Quality · percent · 97.00May · Quality · percent · 97.00Jun · Quality · percent · 96.00Jul · Quality · percent · 98.00Aug · Quality · percent · 98.00Sep · Quality · percent · 98.00
  1. Apr · On time · percent · 91.00
  2. May · On time · percent · 92.00
  3. Jun · On time · percent · 90.00
  4. Jul · On time · percent · 93.00
  5. Aug · On time · percent · 94.00
  6. Sep · On time · percent · 95.00
  7. Apr · Quality · percent · 97.00
  8. May · Quality · percent · 97.00
  9. Jun · Quality · percent · 96.00
  10. Jul · Quality · percent · 98.00
  11. Aug · Quality · percent · 98.00
  12. Sep · Quality · percent · 98.00
Apr to Sep · on time and quality · one point per month ?
  • Apr: on time 91%, quality 97%.
  • May: on time 92%, quality 97%.
  • Jun: on time 90%, quality 96%.
  • Jul: on time 93%, quality 98%.
  • Aug: on time 94%, quality 98%.
  • Sep: on time 95%, quality 98%.

Open this page in the board pack

Lean Operations

Larkspur Precision

Standard skid lines hold the profit and have a named bottleneck. Custom one-offs hurt flow.

Find the waste and the bottleneck in the flow. Put standard work and a daily board on the few streams that hold the profit. An improvement event is a charter with an owner and a date, tied to the Critical Few. Operating measures are not dollars. Only an approved, measured savings reaches the Profit Bridge, and it is never a Cost Reduction cut or a Procurement save.

Done when a waste note and a bottleneck each have a stream, an owner, and a date.

waiting · Standard skid line

On Standard skid line, standard skid line release held work that the next step was not ready for.

Standard skid line release · Reed Cedar · 2026-06-05 · Watch open

Evidence: Walk note 1

movement · Second skid line

On Second skid line, queue held work that the next step was not ready for.

Queue · Reed Cedar · 2026-07-12 · On track turned into an event

Evidence: Walk note 2

extra stock · Valve cell

On Valve cell, do the work held work that the next step was not ready for.

Do the work · Reed Cedar · 2026-11-08 · On track closed with no event

Evidence: Walk note 3

rework or defects · Frame cell

On Frame cell, check held work that the next step was not ready for.

Check · Reed Cedar · 2026-10-13 · Watch open

Evidence: Walk note 4

over-processing · Weld flow

On Weld flow, hand off held work that the next step was not ready for.

Hand off · Reed Cedar · 2026-04-19 · On track turned into an event

Evidence: Walk note 5

over-production · Assembly flow

On Assembly flow, assembly flow release held work that the next step was not ready for.

Assembly flow release · Reed Cedar · 2025-12-17 · On track closed with no event

Evidence: Walk note 6

unused skill · Custom one-offs

On Custom one-offs, queue held work that the next step was not ready for.

Queue · Reed Cedar · 2026-08-22 · Watch open

Evidence: Walk note 7

extra motion · Spare parts cell

On Spare parts cell, do the work held work that the next step was not ready for.

Do the work · Reed Cedar · 2026-05-28 · On track turned into an event

Evidence: Walk note 8

waiting · Standard skid line

On Standard skid line, check held work that the next step was not ready for.

Check · Reed Cedar · 2026-05-02 · On track closed with no event

Evidence: Walk note 9

movement · Second skid line

On Second skid line, hand off held work that the next step was not ready for.

Hand off · Reed Cedar · 2025-10-23 · Watch open

Evidence: Walk note 10

extra stock · Valve cell

On Valve cell, valve cell release held work that the next step was not ready for.

Valve cell release · Reed Cedar · 2026-07-30 · On track turned into an event

Evidence: Walk note 11

rework or defects · Frame cell

On Frame cell, queue held work that the next step was not ready for.

Queue · Reed Cedar · 2025-10-13 · On track closed with no event

Evidence: Walk note 12

over-processing · Weld flow

On Weld flow, do the work held work that the next step was not ready for.

Do the work · Reed Cedar · 2025-09-13 · Watch open

Evidence: Walk note 13

over-production · Assembly flow

On Assembly flow, check held work that the next step was not ready for.

Check · Reed Cedar · 2026-03-17 · On track turned into an event

Evidence: Walk note 14

unused skill · Custom one-offs

On Custom one-offs, hand off held work that the next step was not ready for.

Hand off · Reed Cedar · 2026-11-07 · On track closed with no event

Evidence: Walk note 15

extra motion · Spare parts cell

On Spare parts cell, spare parts cell release held work that the next step was not ready for.

Spare parts cell release · Reed Cedar · 2026-09-07 · Watch open

Evidence: Walk note 16

waiting · Standard skid line

On Standard skid line, queue held work that the next step was not ready for.

Queue · Reed Cedar · 2026-10-30 · On track turned into an event

Evidence: Walk note 17

movement · Second skid line

On Second skid line, do the work held work that the next step was not ready for.

Do the work · Reed Cedar · 2026-08-13 · On track closed with no event

Evidence: Walk note 18

extra stock · Valve cell

On Valve cell, check held work that the next step was not ready for.

Check · Reed Cedar · 2026-11-02 · Watch open

Evidence: Walk note 19

rework or defects · Frame cell

On Frame cell, hand off held work that the next step was not ready for.

Hand off · Reed Cedar · 2026-09-05 · On track turned into an event

Evidence: Walk note 20

over-processing · Weld flow

On Weld flow, weld flow release held work that the next step was not ready for.

Weld flow release · Reed Cedar · 2026-06-29 · On track closed with no event

Evidence: Walk note 21

over-production · Assembly flow

On Assembly flow, queue held work that the next step was not ready for.

Queue · Reed Cedar · 2026-01-24 · Watch open

Evidence: Walk note 22

unused skill · Custom one-offs

On Custom one-offs, do the work held work that the next step was not ready for.

Do the work · Reed Cedar · 2026-01-16 · On track turned into an event

Evidence: Walk note 23

extra motion · Spare parts cell

On Spare parts cell, check held work that the next step was not ready for.

Check · Reed Cedar · 2026-08-09 · On track closed with no event

Evidence: Walk note 24

waiting · Standard skid line

On Standard skid line, hand off held work that the next step was not ready for.

Hand off · Reed Cedar · 2026-07-09 · Watch open

Evidence: Walk note 25

Bottlenecks

  • Standard skid line: Queue
  • Second skid line: Queue
  • Valve cell: Queue
  • Weld flow: Queue
  • Assembly flow: Queue
  • Custom one-offs: Queue

An observation becomes an improvement event only when you type the charter on Events.

Older board

Standard skid line

Second skid line

Valve cell

Frame cell

Weld flow

Assembly flow

Custom one-offs

Spare parts cell

Add a value stream

Improvement events

Improve standard skid line 1 Not on the bridge

Improve second skid line 2 Not on the bridge

Improve valve cell 3 Not on the bridge

Improve frame cell 4 Not on the bridge

Improve weld flow 5 Not on the bridge

Improve assembly flow 6 Not on the bridge

Improve custom one-offs 7 Not on the bridge

Improve spare parts cell 8 Not on the bridge

Improve standard skid line 9 Not on the bridge

Improve second skid line 10 Not on the bridge

Improve valve cell 11 Not on the bridge

Improve frame cell 12 Not on the bridge

Improve weld flow 13 Not on the bridge

Improve assembly flow 14 Not on the bridge

Improve custom one-offs 15 Not on the bridge

Improve spare parts cell 16 Not on the bridge

Improve standard skid line 17 $18.6K

Improve second skid line 18 $26.6K

Improve valve cell 19 $32.1K

Improve frame cell 20 Not on the bridge

Improve weld flow 21 Not on the bridge

Improve assembly flow 22 $22.3K

Improve custom one-offs 23 Not on the bridge

Improve spare parts cell 24 Not on the bridge

Add an improvement event

Signing does not add a dollar.

Receipts

  • 2026-11-01T15:00:00+00:00 · Reed Cedar · Signed the lean reading. No dollars were added. Signed by Reed Cedar.

Teaching

Written lesson

Fix the constraint you can see

Name the step that sets the pace. Improve that step. A project on a step that is not the constraint will not move the promise date.

Cost Is a Choice

Download this page as PDF, Word, or PowerPoint. You print it yourself. PGOS does not mail it.

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

Open Profit Bridge

Open the constraint ?

The constraint is the step that limits the rest of the work.

Lean Operations

This page is the flow, the waste, and the next improvement.