Help
How to use PGOS
Download

Latest year in this book.

Lean Book
You
Theme
Light or dark
Language Sign in
Sample: Hearthside Coaching

Sample company: Hearthside Coaching. These aren't your numbers. See an example: Manufacturer

Other examples

Distributor Regional distributor HVAC and plumbing

Board page

On time and quality

? The same standard as the board pack, for July 2026–September 2026.

Board pack. Earnings are $1,401 behind plan. −$1,401. July 2026–September 2026. File period Jan 15–Dec 15, 2025. The pages in this pack use this quarter. They are not added again. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

On time and first-pass quality, April–September 2026. Goal 95% on time and 98% quality.

Apr to Sep · on time and quality · one point per month. On time (percent), Quality (percent)AprMayJunJulAugSepApr · On time · percent · 91.00May · On time · percent · 92.00Jun · On time · percent · 90.00Jul · On time · percent · 93.00Aug · On time · percent · 94.00Sep · On time · percent · 95.00Apr · Quality · percent · 97.00May · Quality · percent · 97.00Jun · Quality · percent · 96.00Jul · Quality · percent · 98.00Aug · Quality · percent · 98.00Sep · Quality · percent · 98.00
  1. Apr · On time · percent · 91.00
  2. May · On time · percent · 92.00
  3. Jun · On time · percent · 90.00
  4. Jul · On time · percent · 93.00
  5. Aug · On time · percent · 94.00
  6. Sep · On time · percent · 95.00
  7. Apr · Quality · percent · 97.00
  8. May · Quality · percent · 97.00
  9. Jun · Quality · percent · 96.00
  10. Jul · Quality · percent · 98.00
  11. Aug · Quality · percent · 98.00
  12. Sep · Quality · percent · 98.00
Apr to Sep · on time and quality · one point per month ?
  • Apr: on time 91%, quality 97%.
  • May: on time 92%, quality 97%.
  • Jun: on time 90%, quality 96%.
  • Jul: on time 93%, quality 98%.
  • Aug: on time 94%, quality 98%.
  • Sep: on time 95%, quality 98%.

Open this page in the board pack

Lean Operations

Keel & Crane Supply

The Core items and accounts move cleanly. The long tail slows the dock and the pick face.

Find the waste and the bottleneck in the flow. Put standard work and a daily board on the few streams that hold the profit. An improvement event is a charter with an owner and a date, tied to the Critical Few. Operating measures are not dollars. Only an approved, measured savings reaches the Profit Bridge, and it is never a Cost Reduction cut or a Procurement save.

Done when every stream has a kind and you can see work time, wait time, jobs at each step, and a named bottleneck when those facts are typed.

On a wide screen the steps sit in a row. On a phone each step stacks.

4 of 8 streams support 82% of known profit.

? Work time and wait time are the numbers you typed for a step. This page does not invent a unit. Jobs here is how many jobs are sitting at the step. Profit supported is the profit the stream is tied to. It is not a Lean dollar.

Which step holds the wait

The days on this flow. Wait at each step. Each bar is one step. A step with no wait figure stays off. A loss stays off. The longest bar holds the most wait. Nothing here posts.Long-tail pick · Queue48Receiving dock · Queue48Bulk rack · Queue18Core pick face · Queue18Core ship lane · Queue18Fast movers · Queue18Replenishment · Queue18Returns bench · Queue18
  1. Long-tail pick · Queue · 48
  2. Receiving dock · Queue · 48
  3. Bulk rack · Queue · 18
  4. Core pick face · Queue · 18
  5. Core ship lane · Queue · 18
  6. Fast movers · Queue · 18
  7. Replenishment · Queue · 18
  8. Returns bench · Queue · 18
The days on this flow. Wait at each step. Each bar is one step. A step with no wait figure stays off. A loss stays off. The longest bar holds the most wait. Nothing here posts. ?

? Each bar is the wait already typed for that step. The unit is the one you typed. This page does not invent one. A blank wait stays off. It is not stored as zero. A loss stays off. A known zero stays on the chart. The longest bar holds the most wait. The chart shows the eight largest. The rest stay on the flow. Nothing posts.

32 more steps have a wait. They stay on this flow.

On track Core · Core pick face

East warehouse · Pick A · distributor · Profit supported $26.2M

Core pick face. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Core pick face relCore pick face releaseWait 4QueueQueueWait 18BottleneckDo the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Core pick face release

    Work time 12

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 18

    Jobs here 6

    Bottleneck

  3. Do the work

    Work time 16

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 38. Wait 39. The bottleneck is Queue.

On track Core · Core ship lane

West warehouse · Pick B · distributor · Profit supported $14.4M

Core ship lane. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Core ship lane relCore ship lane releaseWait 4QueueQueueWait 18BottleneckDo the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Core ship lane release

    Work time 12

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 18

    Jobs here 6

    Bottleneck

  3. Do the work

    Work time 16

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 38. Wait 39. The bottleneck is Queue.

On track Core · Fast movers

Central warehouse · Pick C · distributor · Profit supported $7.8M

Fast movers. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Fast movers releasFast movers releaseWait 4QueueQueueWait 18BottleneckDo the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Fast movers release

    Work time 12

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 18

    Jobs here 6

    Bottleneck

  3. Do the work

    Work time 16

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 38. Wait 39. The bottleneck is Queue.

On track Core · Replenishment

South warehouse · Receiving A · distributor · Profit supported $5.2M

Replenishment. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Replenishment releReplenishment releaseWait 4QueueQueueWait 18Do the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Replenishment release

    Work time 12

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 18

    Jobs here 6

  3. Do the work

    Work time 16

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 38. Wait 39. No bottleneck is named.

Watch Middle · Receiving dock

East warehouse · Receiving B · distributor · Profit supported $4.6M

Receiving dock. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Receiving dock relReceiving dock releaseWait 4QueueQueueWait 48BottleneckDo the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Receiving dock release

    Work time 6

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 48

    Jobs here 14

    Bottleneck

  3. Do the work

    Work time 10

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 26. Wait 69. The bottleneck is Queue.

Watch Middle · Bulk rack

West warehouse · Pack · distributor · Profit supported $3.2M

Bulk rack. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Bulk rack releaseBulk rack releaseWait 4QueueQueueWait 18BottleneckDo the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Bulk rack release

    Work time 12

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 18

    Jobs here 6

    Bottleneck

  3. Do the work

    Work time 16

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 38. Wait 39. The bottleneck is Queue.

Watch Middle · Long-tail pick

Central warehouse · Pick A · distributor · Profit supported $2.6M

Off track Do not add capacity

Long-tail pick. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Long-tail pick relLong-tail pick releaseWait 4QueueQueueWait 48BottleneckDo the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Long-tail pick release

    Work time 6

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 48

    Jobs here 14

    Bottleneck

  3. Do the work

    Work time 10

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 26. Wait 69. The bottleneck is Queue.

Off track Tail · Returns bench

South warehouse · Pick B · distributor · Profit supported $1.3M

Returns bench. Steps in order. The amber step is the bottleneck. Work time sets the width when every step has a work time. A blank work time keeps the same width. A long name is cut to the box. Nothing here posts.

Returns bench releReturns bench releaseWait 4QueueQueueWait 18Do the workDo the workWait 3CheckCheckWait 6Hand offHand offWait 8

? Each box is one step, left to right, in the order on the file. The amber box is the named bottleneck. A wider box means more work time when every step has a work time. A blank work time does not become zero. A long name is cut to the box. The step list has the full name. Wait time stays under the box. Nothing posts.

  1. Returns bench release

    Work time 12

    Wait time 4

    Jobs here 2

  2. Queue

    Work time 2

    Wait time 18

    Jobs here 6

  3. Do the work

    Work time 16

    Wait time 3

    Jobs here 3

  4. Check

    Work time 5

    Wait time 6

    Jobs here 2

  5. Hand off

    Work time 3

    Wait time 8

    Jobs here 4

Work 38. Wait 39. No bottleneck is named.

? This keeps the stream name, kind, site, team, and the profit it supports. Nothing is sent.

Bottleneck
Yes
Older board

Core pick face

Core ship lane

Fast movers

Replenishment

Receiving dock

Bulk rack

Long-tail pick

Returns bench

Add a value stream

Improvement events

Improve core pick face 1 Not on the bridge

Improve core ship lane 2 Not on the bridge

Improve fast movers 3 Not on the bridge

Improve replenishment 4 Not on the bridge

Improve receiving dock 5 Not on the bridge

Improve bulk rack 6 Not on the bridge

Improve long-tail pick 7 Not on the bridge

Improve returns bench 8 Not on the bridge

Improve core pick face 9 Not on the bridge

Improve core ship lane 10 Not on the bridge

Improve fast movers 11 Not on the bridge

Improve replenishment 12 Not on the bridge

Improve receiving dock 13 Not on the bridge

Improve bulk rack 14 Not on the bridge

Improve long-tail pick 15 Not on the bridge

Improve returns bench 16 Not on the bridge

Improve core pick face 17 $116.2K

Improve core ship lane 18 $166.4K

Improve fast movers 19 $200.9K

Improve replenishment 20 Not on the bridge

Improve receiving dock 21 Not on the bridge

Improve bulk rack 22 $139.5K

Improve long-tail pick 23 Not on the bridge

Improve returns bench 24 Not on the bridge

Add an improvement event

Signing does not add a dollar.

Receipts

  • 2026-11-01T15:00:00+00:00 · Riley Keel · Signed the lean reading. No dollars were added. Signed by Riley Keel.

Teaching

Written lesson

Fix the constraint you can see

Name the step that sets the pace. Improve that step. A project on a step that is not the constraint will not move the promise date.

Cost Is a Choice

Download this page as PDF, Word, or PowerPoint. You print it yourself. PGOS does not mail it.

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

Open Profit Bridge

Open the constraint ?

The constraint is the step that limits the rest of the work.