Help
How to use PGOS
Download

Latest year in this book.

Lean Book
You
Theme
Light or dark
Language Sign in
Sample: Hearthside Coaching

Sample company: Hearthside Coaching. These aren't your numbers. See an example: Manufacturer

Other examples

Distributor Regional distributor HVAC and plumbing

Board page

On time and quality

? The same standard as the board pack, for July 2026–September 2026.

Board pack. Earnings are $1,401 behind plan. −$1,401. July 2026–September 2026. File period Jan 15–Dec 15, 2025. The pages in this pack use this quarter. They are not added again. Quads come from the invoice file. The profit and loss statement is the sum of those invoices.

On time and first-pass quality, April–September 2026. Goal 95% on time and 98% quality.

Apr to Sep · on time and quality · one point per month. On time (percent), Quality (percent)AprMayJunJulAugSepApr · On time · percent · 91.00May · On time · percent · 92.00Jun · On time · percent · 90.00Jul · On time · percent · 93.00Aug · On time · percent · 94.00Sep · On time · percent · 95.00Apr · Quality · percent · 97.00May · Quality · percent · 97.00Jun · Quality · percent · 96.00Jul · Quality · percent · 98.00Aug · Quality · percent · 98.00Sep · Quality · percent · 98.00
  1. Apr · On time · percent · 91.00
  2. May · On time · percent · 92.00
  3. Jun · On time · percent · 90.00
  4. Jul · On time · percent · 93.00
  5. Aug · On time · percent · 94.00
  6. Sep · On time · percent · 95.00
  7. Apr · Quality · percent · 97.00
  8. May · Quality · percent · 97.00
  9. Jun · Quality · percent · 96.00
  10. Jul · Quality · percent · 98.00
  11. Aug · Quality · percent · 98.00
  12. Sep · Quality · percent · 98.00
Apr to Sep · on time and quality · one point per month ?
  • Apr: on time 91%, quality 97%.
  • May: on time 92%, quality 97%.
  • Jun: on time 90%, quality 96%.
  • Jul: on time 93%, quality 98%.
  • Aug: on time 94%, quality 98%.
  • Sep: on time 95%, quality 98%.

Open this page in the board pack

Lean Operations

Keel & Crane Supply

The Core items and accounts move cleanly. The long tail slows the dock and the pick face.

Find the waste and the bottleneck in the flow. Put standard work and a daily board on the few streams that hold the profit. An improvement event is a charter with an owner and a date, tied to the Critical Few. Operating measures are not dollars. Only an approved, measured savings reaches the Profit Bridge, and it is never a Cost Reduction cut or a Procurement save.

Done when every Core stream has a standard, or is flagged without one, or is flagged stale.

Core standards current: 1 of 4.

Off track Replenishment has no standard.

Standard for Core pick face

Core pick face · Riley Keel · Reviewed 2026-05-01 · Off track Stale · Adherence below the line

Release the work, clear the queue, do the work, check, hand off.

Adherence 80.0%

Standard for Core ship lane

Core ship lane · Riley Keel · Reviewed 2026-04-15 · Off track Stale

Release the work, clear the queue, do the work, check, hand off.

Adherence 92.0%

Standard for Fast movers

Fast movers · Riley Keel · Reviewed 2026-10-20 · On track Current

Release the work, clear the queue, do the work, check, hand off.

Adherence Unknown

Older board

Core pick face

Core ship lane

Fast movers

Replenishment

Receiving dock

Bulk rack

Long-tail pick

Returns bench

Add a value stream

Improvement events

Improve core pick face 1 Not on the bridge

Improve core ship lane 2 Not on the bridge

Improve fast movers 3 Not on the bridge

Improve replenishment 4 Not on the bridge

Improve receiving dock 5 Not on the bridge

Improve bulk rack 6 Not on the bridge

Improve long-tail pick 7 Not on the bridge

Improve returns bench 8 Not on the bridge

Improve core pick face 9 Not on the bridge

Improve core ship lane 10 Not on the bridge

Improve fast movers 11 Not on the bridge

Improve replenishment 12 Not on the bridge

Improve receiving dock 13 Not on the bridge

Improve bulk rack 14 Not on the bridge

Improve long-tail pick 15 Not on the bridge

Improve returns bench 16 Not on the bridge

Improve core pick face 17 $116.2K

Improve core ship lane 18 $166.4K

Improve fast movers 19 $200.9K

Improve replenishment 20 Not on the bridge

Improve receiving dock 21 Not on the bridge

Improve bulk rack 22 $139.5K

Improve long-tail pick 23 Not on the bridge

Improve returns bench 24 Not on the bridge

Add an improvement event

Signing does not add a dollar.

Receipts

  • 2026-11-01T15:00:00+00:00 · Riley Keel · Signed the lean reading. No dollars were added. Signed by Riley Keel.

Teaching

Written lesson

Fix the constraint you can see

Name the step that sets the pace. Improve that step. A project on a step that is not the constraint will not move the promise date.

Cost Is a Choice

Download this page as PDF, Word, or PowerPoint. You print it yourself. PGOS does not mail it.

Product names on this page are trademarks of their respective owners. PGOS and The 80/20 Institute are not affiliated with, sponsored by or endorsed by them.

Open Profit Bridge

Open the constraint ?

The constraint is the step that limits the rest of the work.

Lean Operations

This page is the flow, the waste, and the next improvement.

1 of 3

Add to home screen

On iPhone, open the Share menu and choose Add to Home Screen. On Android, use the browser menu and choose Install app or Add to Home screen. The icon is The 80/20 Institute mark.